Routes

Route planner

Features

Product updates

Get the App

Login or Signup

Get the App

Login or Signup

Discover
Places to see

Germany

Bavaria

Middle Franconia

Hammer Hydroelectric Power Plant

Discover
Places to see

Germany

Bavaria

Middle Franconia

Hammer Hydroelectric Power Plant

Hammer Hydroelectric Power Plant

Recommended by 77 hikers out of 82

This Highlight is in a protected area

Please check local regulations for: Pegnitztal Ost

Save

Share

  • More

  • Save

    Share

  • More

  • Take Me There

    Routes here

    Best Hikes to Hammer Hydroelectric Power Plant

    4.7

    (36)

    193

    hikers

    1. Eastern Pegnitz Valley – Oberbürg Moated Castle Ruins loop from Mögeldorf

    8.32km

    02:07

    30m

    Intermediate hike. Good fitness required. Easily-accessible paths. Suitable for all skill levels.

    Navigate

    Send to Phone

    Intermediate

    Expert hike. Very good fitness required. Easily-accessible paths. Suitable for all skill levels.

    Expert

    Intermediate hike. Good fitness required. Easily-accessible paths. Suitable for all skill levels.

    Intermediate

    Tips

    January 9, 2020

    Station 25 of the Pegnitztal - Ost nature adventure trail at the Hammer hydroelectric power station shows the values of the green electricity generated. According to the Bavarian Energy Program of October 2015, the share of hydropower in the gross electricity generation in Bavaria should be 23 to 25% in 2025. The plant belongs to N-ERGIE AG and generates 192 kW as the average electrical power.

    Translated by Google •

      February 26, 2022

      Hammer hydroelectric power station at the factory estate, even with a fish ladder

      The Pegnitz flows past the northern edge of the Hammer factory estate. There is the first weir upstream in the city area. A small hydroelectric power station was built there. Hydropower had previously generated energy for the factory estate at that location.

      The ambitious plan in 2015 was to significantly increase the proportion of electricity generated by water in Bavaria to almost 25 percent by 2025 (in 2020 it was around 15 percent). In the meantime, the all too radical increase in the generation of electricity from hydropower is no longer considered ecologically sensible, as the rivers are being disturbed too much in their natural course. A small one like the one in Laufamholz is hardly noticeable in Bavaria's overall balance and does not disturb the further natural course of the Pegnitz.

      dernuernberger.blogspot.com/2022/08/wasserkraft-in-hammer.html

      Translated by Google •

        January 10, 2020

        Green electricity is produced here, with a display

        Translated by Google •

          Sign up for a free komoot account to get 4 more insider tips and takes.

          Sign up for free

          Details

          Informations

          Elevation 360 m

          Weather

          Powered by AerisWeather

          Today

          Sunday 21 September

          26°C

          11°C

          0 %

          If you start your activity now...

          Max wind speed: 7.0 km/h

          Most visited during

          January

          February

          March

          April

          May

          June

          July

          August

          September

          October

          November

          December

          Loading

          Location: Middle Franconia, Bavaria, Germany

          Other Popular Places to Check Out

          Explore
          RoutesRoute plannerFeaturesHikesMTB TrailsRoad cycling routesBikepacking
          Download the app
          Follow Us on Socials

          © komoot GmbH

          Privacy Policy