Rzeszów Dam – Gabriela Narutowicza Bridge loop from Rzeszów Główny
Rzeszów Dam – Gabriela Narutowicza Bridge loop from Rzeszów Główny
4.2
(10)
150
runners
00:51
8.21km
30m
Running
Moderate run. Good fitness required. Mostly paved surfaces. The starting point of the route is accessible with public transport.
Last updated: September 10, 2026
Tips
Includes a short out-and-back section
Your route doubles back at a waypoint. If this isn’t intentional, adjust the waypoint’s position.
After 1.93 km for 33 m
Waypoints
Start point
Train Station
1.95 km
Highlight • Bridge
Translated by Google •
Tip by
3.74 km
Highlight • MTB Park
Translated by Google •
Tip by
4.12 km
Highlight • Structure
4.77 km
Highlight • Monument
Translated by Google •
Tip by
5.89 km
Highlight • Cycleway
Translated by Google •
Tip by
6.20 km
Highlight • Bridge
Translated by Google •
Tip by
8.21 km
End point
Train Station
Way Types & Surfaces
Way Types
4.23 km
2.60 km
1.12 km
221 m
< 100 m
Surfaces
4.41 km
3.38 km
231 m
202 m
Sign up to see more specific route details
Sign up for freeElevation
Sign up to see more specific route details
Sign up for freeWeather
Powered by Foreca
Tuesday 27 October
12°C
7°C
11 %
Additional weather tips
Max wind speed: 6.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Want to know more?
Sign up for a free komoot account to join the conversation.