komoot
  • Routes
  • Route planner
  • Features
  • Product updates
Discover
Places to see

Germany

North Rhine-Westphalia

Münster District

Ruhr Region

Kreis Unna

Lünen

Cableway Route Zeche Minister Achenbach – Brambauer Cycle Path

Discover
Places to see

Germany

North Rhine-Westphalia

Münster District

Ruhr Region

Kreis Unna

Lünen

Cableway Route Zeche Minister Achenbach – Brambauer Cycle Path

Cableway Route Zeche Minister Achenbach – Brambauer Cycle Path

Cycling Highlight (Segment)

Recommended by 367 out of 389 cyclists

See rides here
  • Take Me There
  • Suggest an Edit
Loading

Location: Lünen, Kreis Unna, Ruhr Region, Münster District, North Rhine-Westphalia, Germany

Top cycling routes to Cableway Route Zeche Minister Achenbach – Brambauer Cycle Path

Tips

  • Material was transported in the pot not only by train, but also by cable car - which is somehow also a train. And a cable car also needs a track on which to build. If the cable car is no longer needed, here also offers a very nice way of recultivation: the (train) path bike path.

    2.6 km follow the old route, while you cycle mostly on a water-bound ceiling. By the way, the former cable car belonged to the mine Minister Achenbach, which was shut down in the 1990s. On the way you will pass relics of the mining industry. Most striking is probably the so-called "Colani egg": former winding tower, now a business lounge. The path is a nice connection between Datteln-Hamm and Dortmund-Ems-Kanal.

    translated byGoogle
    • July 8, 2019

  • From 1922 onwards, shaft 4 produced the first coal for the mine's own consumption. Because there was no underground connection to shaft 1/2, another solution had to be found to transport the coal from the east field to shaft 1/2. This problem was solved by having a 2.2 km long cable car built. On May 20th, 1921, the Pohlig company in Cologne was awarded the contract for this cable car. On March 5th, 1923, the cable car went into operation and produced the first coal to shaft 1/2. This cable car was built right through the town of Brambauer. From shaft 4, the route led behind the gardens of the colliery colony, past the old cemetery in the direction of Waltroper Strasse. There the cable car crossed Waltroper Strasse in the area of the Wittekindschule (the then Auguste-Victoria-Schule). The route then led across open fields to the Gasthof Fels. There was a cable tensioning station and a curve to guide the cable car towards Shaft 1/2.minister-achenbach.de/seilbahn.html

    translated byGoogle
    • August 19, 2022

  • Cable car Minister AchenbachFrom 1922, shaft 4 extracted the first coal for its own consumption. Because there was no underground connection to shaft 1/2, another solution had to be found to transport the coal from the east field to shaft 1/2. This problem was solved by having a 2.2 km long cable car built. On May 20, 1921, the Pohlig company in Cologne was awarded the contract for this cable car. On March 5, 1923, the cable car went into operation and extracted the first coal to shaft 1/2. This cable car was built right through the town of Brambauer. From shaft 4, the route led behind the gardens of the mining colony past the old cemetery in the direction of Waltroper Strasse. There the cable car crossed Waltroper Strasse in the area of the Wittekindschule (the Auguste-Viktoria-Schule at the time). The route then led across open fields to the Gasthof Fels. There was a cable tensioning station and a curve to take the cable car towards Shaft 1.

    translated byGoogle
    • July 10, 2022

Sign up for a free komoot account to get 16 more insider tips and takes.

See rides here
Loading

Location: Lünen, Kreis Unna, Ruhr Region, Münster District, North Rhine-Westphalia, Germany

Information

  • Distance3.28 km
  • Uphill10 m
  • Downhill40 m

Most Visited During

  • Jan
  • Feb
  • Mar
  • Apr
  • May
  • Jun
  • Jul
  • Aug
  • Sep
  • Oct
  • Nov
  • Dec

Weather on route - Lünen

Loading