Routes

Planner

Features

Updates

App

Login or Signup

Get the App

Login or Signup

Discover
Places to see
Germany
Bremen

Lesum Sluice and Bridge

Discover
Places to see
Germany
Bremen

Lesum Sluice and Bridge

Highlight • Bridge

Lesum Sluice and Bridge

Recommended by 349 road cyclists out of 363

Save

Share

  • More

  • Save

    Share

  • More

  • Take Me There

    Routes here

    Best Road Cycling Rides to Lesum Sluice and Bridge

    4.6

    (40)

    536

    riders

    1. Lesumbroker Dike – Weser Riverside Cycle Path loop from Bremen-Vegesack

    62.3km

    02:31

    150m

    150m

    Intermediate road ride. Good fitness required. Some segments of this route may be unpaved and difficult to ride.

    Navigate

    Send to Phone

    Intermediate

    Easy road ride. Great for any fitness level. Mostly well-paved surfaces and easy to ride.

    Easy

    Intermediate road ride. Good fitness required. Some segments of this route may be unpaved and difficult to ride.

    Intermediate

    Tips

    October 18, 2019

    For evening drivers: From 22-6 clock is the bridge above and open for shipping, so you can not get over! From 23 clock is the bridge every hour on the hour for 5 minutes down and passable. I speak from experience. I was driving there with a girlfriend inliner, we missed the time and had to spend an hour on the barrage.

    Translated by Google •

      April 9, 2020

      The construction of a barrier on the Lesum was already considered in 1617. At that time the plan failed due to the veto of the Oldenburg Count Anton Günther, who feared greater dangers for the Stedinger Land on the left side due to improved flood protection on the right side of the Weser. There were repeated plans for such a project.

      On September 18, 1968, the states of Lower Saxony and Bremen signed a state treaty to build three barriers. The Lesum barrage should be built at the same time as the Ochtum barrage (near Lemwerder-Altenesch) and the Hunt barrage (near Elsfleth), as the construction of a single barrage could have had a negative impact on the water levels in the other waters. Construction began in April 1971, the first lock gate was hung in at the end of 1971, the first construction stage was flooded at the end of 1972, the bridge structure was completed in March and the structure was completed by summer 1974.

      Translated by Google •

        July 26, 2019

        I always like to drive over it, as a turning point for my lap of Findorff, but it can sometimes be closed or for the ships on. Then it simply means: wait.

        Translated by Google •

          Sign up for a free komoot account to get 6 more insider tips and takes.

          Sign up for free

          Details

          Informations

          Elevation 0 m

          Weather

          Powered by AerisWeather

          Today

          Saturday 25 October

          11°C

          7°C

          70 %

          If you start your activity now...

          Max wind speed: 28.0 km/h

          Most visited during

          January

          February

          March

          April

          May

          June

          July

          August

          September

          October

          November

          December

          Loading

          Location: Bremen, Germany

          Other Popular Places to Check Out

          Lesum Flood Barrier

          Explore
          RoutesRoute plannerFeaturesHikesMTB TrailsRoad cycling routesBikepacking
          Download the app
          Follow Us on Socials

          © komoot GmbH

          Privacy Policy