Routes

Route planner

Features

Product updates

Get the App

Login or Signup

Get the App

Login or Signup

Discover
Places to see

Liechtenstein

Binnenkanal Ruggell

Discover
Places to see

Liechtenstein

Binnenkanal Ruggell

Binnenkanal Ruggell

Recommended by 24 hikers

Save

Share

  • More

  • Save

    Share

  • More

  • Take Me There

    Routes here

    Best Hikes to Binnenkanal Ruggell

    4.5

    (2)

    27

    hikers

    1. Binnenkanal Ruggell – Ruggeller Riet loop from Ruggell

    7.31km

    01:51

    10m

    Easy hike. Great for any fitness level. Easily-accessible paths. Suitable for all skill levels.

    Navigate

    Send to Phone

    Easy

    Easy hike. Great for any fitness level. Easily-accessible paths. Suitable for all skill levels.

    Easy

    Easy hike. Great for any fitness level. Easily-accessible paths. Suitable for all skill levels.

    Easy

    Tips

    October 23, 2022

    inland canal

    Artificial body of water built in 1931-43 to drain the Liechtenstein valley. The inland canal crosses Liechtenstein over a length of 24.67 km in a south-north direction. Its catchment area covers 117 km2; In addition, water from the Samina valley is supplied via the Samina plant (approx. 1.5 m3/s).

    The reason for the construction was the increasing waterlogging of the valley floor since the 18th century and the restricted outflow of the streams into the Rhine as a result of the rising Rhine bed. From 1834, a canal was built in the Ried between Schaan and Bendern (up to the Esche estuary) as a forerunner of the later inland canal. However, there was no permanent drainage and unhindered outflow of the Rhine feeder. In 1894, the state parliament first discussed the idea of an inland canal that would flow through the whole of Liechtenstein. After the preparation of six reports, the project based on the work of Philipp Krapf, Felix Nesper, Jost Wey and Arnold Fussenegger was implemented by state engineer Josef Vogt.

    The construction of the inland canal was accepted by the state parliament on July 7, 1930 (with one dissenting vote) and after a referendum by the municipalities of Balzers, Triesen and Triesenberg on December 14, 1930 in a referendum (1469 yes, 616 no). The function of the canal construction as emergency work (→ job creation) was decisive for the clear assumption, which is considered an act of solidarity between the Oberland and the Unterland, which was particularly affected by the swamp, between workers and farmers and between the parties. The construction took place in stages. At the same time, some streams were regulated and several canals were created. The immense total costs of the inland canal, completed on April 3, 1943, amounted to CHF 4.6 million.

    The construction of the inland canal is considered a work of the century. It enabled the final and permanent drainage of the Liechtenstein valley area and thus its intensive agricultural use and settlement. The valley water system and its ecological characteristics have been fundamentally changed (→water bodies). With the exception of the Ruggeller Mölibach (introduction to the Spiersbach), all former Rhine tributaries now flow into the inland canal, which is the only remaining connection to the main body of water in Liechtenstein. In 2000, the natural redesign of the inland canal confluence with the Rhine took place.

    Text / Source: Historical Encyclopedia of the Principality of Liechtenstein

    historisches-lexikon.li/Binnenkanal

    Translated by Google •

      October 23, 2022

      The renaturation of the Liechtenstein inland canal estuary - a success story

      The renaturation of the mouth of the Liechtenstein inland canal is a successful example of how tributaries can be reconnected with the Alpine Rhine. An important habitat was also created from the artificial body of water over a length of 1700 meters, which assumes a central function for the ecology of the entire region. A success story that can serve as a model for further renaturation.

      Redesign of the mouth area in three stages

      In 1989/90 and 1992/93 revitalization measures were carried out one to two kilometers behind the estuary. The goal was the near-natural restructuring of the canal bed and the creation of calm water zones, pond biotopes and floodplain forest. As the third and most important stage, the last 500 meters of the estuary were redesigned in 1999/2000, the fish ladder removed and the inland canal reconnected to the Alpine Rhine at the same level.

      Text / Source: Dr. Helmut Kindle

      lebendigerrhein.org/fileadmin/user_upload/lebendigerrhein-data/klon/b_documents/14_Helmut_Kindle.pdf

      Translated by Google •

        In the know? Log-in to add a tip for other adventurers!

        Sign up for free

        Details

        Informations

        Elevation 490 m

        Weather

        Powered by AerisWeather

        Today

        Saturday 20 September

        28°C

        14°C

        0 %

        If you start your activity now...

        Max wind speed: 7.0 km/h

        Most visited during

        January

        February

        March

        April

        May

        June

        July

        August

        September

        October

        November

        December

        Loading

        Location: Liechtenstein

        Other Popular Places to Check Out

        Explore
        RoutesRoute plannerFeaturesHikesMTB TrailsRoad cycling routesBikepacking
        Download the app
        Follow Us on Socials

        © komoot GmbH

        Privacy Policy