Wire rope bridge at the upper end of the Nonnensteig
Wire rope bridge at the upper end of the Nonnensteig
Highlight • Bridge
Mountaineering
5.0
(38)
Hiking
5.0
(1)
Tips
October 2, 2021
Mountaineering
November 6, 2020
Mountaineering
June 6, 2025
Mountaineering
In the know? Log-in to add a tip for other adventurers!
Sign up for free
Nearby routes
Best routes near Wire rope bridge at the upper end of the Nonnensteig
5.0
(5)
33
hikers
Hard mountaineering route. Great for any fitness level. Sure-footedness, sturdy shoes and alpine experience required.
6
hikers
10.1km
03:10
340m
340m
Moderate mountaineering route. Good fitness required. Mostly accessible paths. Sure-footedness required.
2
hikers
8.71km
02:42
250m
250m
Moderate mountaineering route. Good fitness required. Mostly accessible paths. Sure-footedness required.
Details
Informations
Elevation 510 m
Weather
Powered by Foreca
Sunday 12 April
17°C
4°C
17 %
Additional weather tips
Max wind speed: 22.0 km/h
Most visited during
January
February
March
April
May
June
July
August
September
October
November
December