Cycling Highlight
Recommended by 437 out of 467 cyclists
Location: Magdeburg, Saxony-Anhalt, Germany
4.6
(124)
604
01:21
20.3km
70m
4.7
(674)
2,629
03:13
50.3km
140m
4.3
(36)
162
03:56
65.5km
140m
The construction of today's bridge structure began in 1880 and was carried out almost simultaneously with the construction of the customs bridge. The inauguration of both bridges, which together cost one million marks, took place in 1882. Both bridges were equipped with devices so that they could be blown up at short notice in the event of war. These devices were apparently equipped with TNT during World War II in order to be able to blow up the bridge if the Allies advanced. By September 2016, around 140 kilograms had been found. A further search for any explosives that may still be present should be carried out from the beginning of October 2016.
Source and further information:
de.m.wikipedia.org/wiki/Anna-Ebert-Br%C3%BCcke
June 17, 2019
It spans the Old Elbe to Zollelbe, it is designed in the style of the Renaissance, and richly decorated with zodiac signs.
July 11, 2017
Sign up for a free komoot account to get 8 more insider tips and takes.
Location: Magdeburg, Saxony-Anhalt, Germany
4.6
(124)
604
01:21
20.3km
70m
4.7
(674)
2,629
03:13
50.3km
140m
4.3
(36)
162
03:56
65.5km
140m