Bullay Railway Bridge – Pünderich Hang Viaduct loop from Neef
Bullay Railway Bridge – Pünderich Hang Viaduct loop from Neef
4.7
(805)
3,277
riders
02:11
33.9km
190m
Cycling
Moderate bike ride. Good fitness required. Mostly paved surfaces. Suitable for all skill levels. The starting point of the route is accessible with public transport.
Last updated: March 23, 2026
Tips
Includes segments that go up or down a series of steps
You may need to carry your bike.
After 84 m for 31 m
After 33.8 km for 5 m
Waypoints
Start point
Train Station
Get Directions
3.69 km
Highlight (Segment) • Cycleway
Translated by Google •
Tip by
6.60 km
Highlight • Bridge
Translated by Google •
Tip by
11.3 km
Highlight • Bridge
Translated by Google •
Tip by
17.5 km
Highlight • Viewpoint
Translated by Google •
Tip by
24.3 km
Highlight • Settlement
Translated by Google •
Tip by
27.3 km
Highlight • Cycleway
Translated by Google •
Tip by
28.6 km
Highlight • Bridge
Translated by Google •
Tip by
33.4 km
Highlight • Monument
Translated by Google •
Tip by
33.9 km
End point
Train Station
Way Types & Surfaces
Way Types
15.2 km
7.89 km
5.49 km
2.82 km
2.31 km
183 m
< 100 m
< 100 m
Surfaces
24.9 km
4.78 km
1.74 km
1.43 km
742 m
368 m
Sign up to see more specific route details
Sign up for free
Elevation
Sign up to see more specific route details
Sign up for free
Weather
Powered by Foreca
Sunday 5 April
14°C
3°C
-- %
Additional weather tips
Max wind speed: -- km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.