South County Trailway – South County Trailway loop from Hastings-on-Hudson
South County Trailway – South County Trailway loop from Hastings-on-Hudson
2.5
(20)
70
riders
03:21
55.8km
390m
Cycling
Moderate bike ride. Good fitness required. Mostly paved surfaces. Suitable for all skill levels. The starting point of the route is accessible with public transport.
Last updated: May 30, 2026
Tips
Includes segments that go up or down a series of steps
You may need to carry your bike.
After 16 m for 19 m
After 55.8 km for 19 m
Waypoints
Start point
Train Station
Get Directions
12.9 km
Highlight • Cycleway
Translated by Google •
Tip by
15.2 km
Highlight • Cycleway
Translated by Google •
Tip by
15.2 km
Highlight • Lake
Tip by
17.0 km
Highlight (Segment) • Cycleway
Translated by Google •
Tip by
29.1 km
Highlight • Cycleway
Translated by Google •
Tip by
32.5 km
Highlight • Lake
Translated by Google •
Tip by
33.1 km
Great Hunger Memorial Park
Forest
41.7 km
Highlight • Lake
Translated by Google •
Tip by
53.0 km
Highlight • Settlement
Translated by Google •
Tip by
55.8 km
End point
Train Station
Way Types & Surfaces
Way Types
39.9 km
8.26 km
3.79 km
2.74 km
849 m
139 m
117 m
Surfaces
52.0 km
2.75 km
879 m
134 m
< 100 m
Sign up to see more specific route details
Sign up for free
Elevation
Sign up to see more specific route details
Sign up for free
Weather
Powered by Foreca
Today
Wednesday 24 June
28°C
16°C
0 %
Additional weather tips
Max wind speed: 17.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Description
If you're looking for a solid touring cycling day trip that feels like an escape without truly leaving the city's orbit, the South County Trailway – South County Trailway loop from Hastings-on-Hudson is a moderate 34.7-mile (55.8 km) ride with 1264 feet (385 metres) of elevation gain, taking about 3 hours and 21 minutes. It's a fantastic option for cyclists who want a car-free, mostly paved experience through varied scenery, best suited for those with good fitness looking for a sustained effort.
What to expect on South County Trailway – South County Trailway loop from Hastings-on-Hudson
This route largely follows a paved rail-trail, offering smooth asphalt and concrete surfaces that make for comfortable touring cycling. You'll trace a "backcountry route" through surprising pockets of nature, from wooded areas and parks to golf courses and riverbanks along the Saw Mill River floodplain and Tibbetts Brook. Keep an eye out for historic marker plaques at former railroad stations, adding a touch of history to your ride, and consider a stop at the Great Hunger Memorial Park in Elmsford. While the trail itself is generally easy, this specific loop from Hastings-on-Hudson is rated moderate, meaning it's best suited for cyclists with good fitness looking for a longer, sustained ride.
Planning your visit
Accessing the trail from Hastings-on-Hudson is straightforward, especially with the pedestrian bridge built in 2016 that connects a housing development directly to the trailway. The trail is part of a larger network and is very popular, so expect to share the path with runners, walkers, and other cyclists. As it's a multi-use path, it's generally accessible year-round, but always check local conditions, especially after heavy rain, as parts follow river floodplains.
Trail details
Comments
Want to know more?
Sign up for a free komoot account to join the conversation.
Sign up for free