South County Trailway – South County Trailway loop from Baychester Avenue
South County Trailway – South County Trailway loop from Baychester Avenue
3.0
(4)
70
riders
06:07
106km
510m
Cycling
Hard bike ride. Very good fitness required. Mostly paved surfaces. The starting point of the route is accessible with public transport.
Last updated: August 29, 2026
Waypoints
Start point
Train Station
8.98 km
Highlight • Lake
Tip by
9.28 km
Van Cortlandt Lake
Lake
11.3 km
Highlight • Cycleway
Translated by Google •
Tip by
26.3 km
Highlight • Lake
Translated by Google •
Tip by
26.9 km
Great Hunger Memorial Park
Forest
46.9 km
Echo Lake
Lake
53.1 km
Highlight • Bridge
Tip by
54.8 km
Highlight (Segment) • Cycleway
Tip by
83.2 km
Highlight • Cycleway
Translated by Google •
Tip by
93.6 km
Highlight (Segment) • Cycleway
Translated by Google •
Tip by
97.1 km
Highlight • Cycleway
Translated by Google •
Tip by
106 km
End point
Train Station
Way Types & Surfaces
Way Types
104 km
913 m
330 m
142 m
< 100 m
Surfaces
103 km
2.73 km
301 m
Sign up to see more specific route details
Sign up for freeElevation
Highest point (110 m)
Lowest point (0 m)
Sign up to see more specific route details
Sign up for freeWeather
Powered by Foreca
Today
Saturday 31 October
15°C
9°C
0 %
Additional weather tips
Expect light wind and shifting conditions.
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Want to know more?
Sign up for a free komoot account to join the conversation.