Cable-stayed bridge – New Rhine bridge near Fussach loop from Götzis
Cable-stayed bridge – New Rhine bridge near Fussach loop from Götzis
4.6
(14)
284
riders
02:21
58.6km
90m
Road cycling
Moderate road ride. Good fitness required. Some segments of this route may be unpaved and difficult to ride. The starting point of the route is accessible with public transport.
Last updated: August 20, 2026
Tips
Includes a segment in which cycling is not permitted
After 34.9 km for 165 m
Waypoints
Start point
Train Station
Get Directions
11.6 km
Highlight • Restaurant
Translated by Google •
Tip by
27.0 km
Highlight • Beach
Translated by Google •
Tip by
29.7 km
Schöpfwerk Fussach
Lake
32.5 km
Highlight • Bridge
Showing Translation
Tip by
32.8 km
Highlight • Bridge
Translated by Google •
Tip by
32.9 km
Highlight • Structure
Tip by
33.1 km
Highlight • River
Translated by Google •
Tip by
35.8 km
Fischteich
Lake
36.5 km
Highlight • Bridge
Translated by Google •
Tip by
47.8 km
Highlight (Segment) • Cafe
Translated by Google •
Tip by
58.6 km
End point
Train Station
Way Types & Surfaces
Way Types
34.2 km
11.0 km
10.7 km
2.56 km
167 m
< 100 m
Surfaces
55.7 km
2.09 km
580 m
167 m
< 100 m
< 100 m
Sign up to see more specific route details
Sign up for free
Elevation
Sign up to see more specific route details
Sign up for free
Weather
Powered by Foreca
Tuesday 25 August
26°C
16°C
0 %
Additional weather tips
Max wind speed: 3.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Showing Translation
🩵
Want to know more?
Sign up for a free komoot account to join the conversation.
Sign up for free