Hiking Highlight
Recommended by 122 out of 128 hikers
The Ochtum is in free connection with the Lower Weser and is subject to the influence of the tides. Construction work on the Ochtum barrage began in 1971/72.
On June 2, 1976, the first pleasure craft passed the new lock. Up to this point in time, a movable bridge was operated for shipping.
(TI Lemwerder)
March 17, 2021
There was probably nothing with Corona. I would have loved to have a fish sandwich.
January 13, 2021
Just around the corner there is a fish stall on Wednesday, Thursday and Friday to strengthen.
October 5, 2016
Sign up for a free komoot account to get 4 more insider tips and takes.