Routes

Planner

Features

Updates

App

Login or Signup

Get the App

Login or Signup

Discover
Places to see
Poland
Szczecin
Szczecin

Głębokie loop

Highlight • Rest Area

Głębokie loop

Recommended by 67 cyclists out of 74

Save

Share

  • More

  • Save

    Share

  • More

  • Take Me There

    Routes here

    Top cycling routes to Głębokie loop

    5.0

    (18)

    161

    riders

    1. Syrenie Stawy – Beach Entrance – Jezioro Głębokie loop from Szczecin Łękno

    30.4km

    02:07

    110m

    110m

    Intermediate bike ride. Good fitness required. Mostly paved surfaces. Suitable for all skill levels.

    Navigate

    Send to Phone

    Intermediate

    Easy bike ride. Great for any fitness level. Mostly paved surfaces. Suitable for all skill levels.

    Easy

    Intermediate bike ride. Good fitness required. Mostly paved surfaces. Suitable for all skill levels.

    Intermediate

    Tips

    August 27, 2023

    A new bus and tram terminus at Lake Głębokie.

    Translated by Google •

      May 27, 2024

      Bus and tram terminus, next to the roundabout, around which there are bicycle routes, on the opposite side of the roundabout, at the entrance to the swimming pool. A deep place with benches is the main meeting point for cyclists, who then usually go towards Wołczkowo

      Translated by Google •

        June 27, 2025

        From the Szczecin City Council's announcement on the completion of the new tram terminus in December 2020:

        "One of the most important construction phases at the Głębokie interchange has been completed. Starting next Tuesday, December 1st of this year, trams will return to the Głębokie turnaround point.

        Tests of the newly constructed infrastructure – tracks, switches, traction, and stops – were completed on Friday morning. The successful passage of the tram means that the turnaround loop is ready for use by public transport. As part of the work completed so far at the turnaround point, approximately 1.1 km of single-track tram tracks have been laid. Door-to-door tram and bus stops have also been built.

        In the next stages of the investment, the intersection adjacent to the turnaround loop will be converted into a roundabout. A parking lot will also be built. In addition, a building will be built at the turning point itself to serve as a waiting room for passengers and a social building for drivers.

        Translated by Google •

          In the know? Log-in to add a tip for other adventurers!

          Sign up for free

          Details

          Informations

          Elevation 10 m

          Weather

          Powered by AerisWeather

          Today

          Thursday 6 November

          12°C

          5°C

          0 %

          If you start your activity now...

          Max wind speed: 9.0 km/h

          Most visited during

          January

          February

          March

          April

          May

          June

          July

          August

          September

          October

          November

          December

          Loading

          Location: Szczecin, Szczecin, Poland

          Other Popular Places to Check Out

          Arkonka Recreational Path

          Explore
          RoutesRoute plannerFeaturesHikesMTB TrailsRoad cycling routesBikepacking
          Download the app
          Follow Us on Socials

          © komoot GmbH

          Privacy Policy