Restwasserkraftwerk

Hiking Highlight

Recommended by 9 out of 9 hikers

Tips

  • Natascha

    The power plant on the Iller goes into operation after only nine months of construction in 2015. The electricity is generated by two "Francis turbines" with a total of 300 kilowatts (kW) of power plant output and a steam turbine with 150 kW.
    Above is a small bar with umbrellas and sun loungers right on the river Iller to relax. A popular meeting place for young and old.

    translated byView Original
    • 10/06/2018

In the know? Log-in to add a tip for other adventurers!

or
Sign Up With Email

Best Hikes that include the Highlight ‘Restwasserkraftwerk’

Location: in the Allgäu, Swabia, Bavaria, Germany

Helpful Information

  • Elevation710 m

Most Visited During

  • Jan
  • Feb
  • Mar
  • Apr
  • May
  • Jun
  • Jul
  • Aug
  • Sep
  • Oct
  • Nov
  • Dec

Weather Forecast - Allgäu