komoot
  • Routes
  • Route planner
  • Features
  • Product updates
Discover
Places to see

Poland

Silesian Voivodeship

powiat żywiecki

gmina Czernichów

Porąbka Dam

Discover
Places to see

Poland

Silesian Voivodeship

powiat żywiecki

gmina Czernichów

Porąbka Dam

Porąbka Dam

Cycling Highlight

Recommended by 83 out of 85 cyclists

See rides here
  • Take Me There
  • Suggest an Edit
Loading

Location: gmina Czernichów, powiat żywiecki, Silesian Voivodeship, Poland

Top cycling routes to Porąbka Dam

Tips

  • The dam in Porąbka, on the Sola River, looks both impressive and elegant. In the interwar period, when it was created, it was considered the pinnacle of technological advancement. The future president of the Republic of Poland, Gabriel Narutowicz, worked on the design of the dam. It was built with enormous effort to prevent catastrophic floods in the Soła Valley. After World War II, a small hydroelectric power plant was built at the dam.
    Works were supposed to start in 1914, but World War I thwarted these plans.
    The subject of construction returned immediately after its completion. The dam design was consulted with Gabriel Narutowicz, the creator of the dam on the Aar River in Mühlenberg, Switzerland. The narrowing between the Żaru and Zasolnica massifs was chosen as the site of the Soła dam. Construction began in 1921. However, due to scarce funds, it was repeatedly discontinued. Soła was also not idle and was destroying the effects of human efforts. The work started again from the hoof in 1934. The project was supervised by an outstanding specialist - engineer Jerzy Skrzyński. The company Frankopol was building. For the purposes of the investment, a small power plant was opened nearby. The latest technological achievements were used - e.g. waterproof cement from Goleszów. 2,500 workers and several hundred juniors passed through the construction site. The dam is 260 m long and 37.4 high; throughput - 1690 cubic meters. The capacity of the Międzybrodzkie Lake was calculated at 32.2 million cubic meters. The cost of the project was over PLN 20 million at that time! The construction site was visited by President Ignacy Mościcki himself. The opening ceremony in December 1936 was attended, among others, by Deputy Prime Minister Eugeniusz Kwiatkowski and Cardinal Adam Sapieha. In the 1950s, a hydroelectric power plant was commissioned at the dam. Currently, it has a capacity of 12.6 MW.
    zabytkitechniki.pl/culturalheritage/3129/zapora-w-porabce
    porabka.net/budowa-zapory.html

    translated byGoogle
    • May 18, 2021

In the know? Log-in to add a tip for other adventurers!

Description

See rides here
Loading

Location: gmina Czernichów, powiat żywiecki, Silesian Voivodeship, Poland

Most Visited During

  • Jan
  • Feb
  • Mar
  • Apr
  • May
  • Jun
  • Jul
  • Aug
  • Sep
  • Oct
  • Nov
  • Dec

Weather on route - gmina Czernichów

Loading

Other Popular Places to Check Out