Cycling Highlight
Recommended by 1926 out of 1994 cyclists
Location: Saxony, Germany
4.4
(273)
945
01:22
22.7km
80m
4.8
(592)
2,060
02:06
34.6km
210m
4.6
(25)
135
03:40
56.3km
460m
The Schusterstein Tunnel was built between 1900 and 1902 during the construction of the Chemnitz Küchwald-Wechselburg railway line. It passes under part of the Schusterstein massif, which is responsible for the beautiful meander (loop) of the Chemnitz River. Today, with its bridge-tunnel-bridge combination, it is one of the most beautiful sections of the Chemnitz Valley Cycle Path following renovations from 2015 to 2016.
September 3, 2016
Sign up for a free komoot account to get 27 more insider tips and takes.
Location: Saxony, Germany
4.4
(273)
945
01:22
22.7km
80m
4.8
(592)
2,060
02:06
34.6km
210m
4.6
(25)
135
03:40
56.3km
460m