Routes

Planner

Features

Updates

App

Login or Signup

Get the App

Login or Signup

Discover
Places to see

Austria

Lower Austria

Mostviertel

Bezirk Tulln

Zwentendorf an der Donau

Zwentendorf Nuclear Power Plant

Discover
Places to see

Austria

Lower Austria

Mostviertel

Bezirk Tulln

Zwentendorf an der Donau

Zwentendorf Nuclear Power Plant

Zwentendorf Nuclear Power Plant

Recommended by 18 hikers out of 19

Save

Share

  • More

  • Save

    Share

  • More

  • Take Me There

    Routes here

    Best Hikes to Zwentendorf Nuclear Power Plant

    4.4

    (7)

    33

    hikers

    1. Bärndorfer Hut loop from Altenwörth

    8.06km

    02:03

    20m

    20m

    Intermediate hike. Good fitness required. Easily-accessible paths. Suitable for all skill levels.

    Navigate

    Send to Phone

    Intermediate

    Easy hike. Great for any fitness level. Easily-accessible paths. Suitable for all skill levels.

    Easy

    Easy hike. Great for any fitness level. Easily-accessible paths. Suitable for all skill levels.

    Easy

    Tips

    August 18, 2022

    Here you have a nice view of what is probably the safest nuclear power plant in the world.

    On April 4, 1972, the groundbreaking ceremony for the construction project "nuclear power plant Zwentendorf", which had been decided a year earlier by the general assembly of the joint nuclear power plant Tullnerfeld. On February 15, 1972, excavation began at the construction site. The cost of construction was around 8,466 million Schilling (1979) The type of nuclear power plant corresponded to a boiling water reactor. The bottleneck capacity was designed for 730 megawatts.

    In the summer of 1977, protest demonstrations also took place in Austria, strongly influenced by the opponents of nuclear power plants in West Germany. In the session of the National Council on July 7, 1978, a resolution was passed on a draft law which in any case bound the further use of nuclear energy to the approval of the National Council and provided for a referendum.

    The referendum of November 5, 1978 ended with a participation of around two-thirds of those eligible to vote with 50.5% against and 49.5% for the commissioning. In Zwentendorf, the majority of the population voted in favor of commissioning.

    Translated by Google •

      May 13, 2020

      Austrian contemporary history and a lesson in Austrian politics. Zwentendorf was the only nuclear power plant in the world to be completed, but never put into operation due to a referendum. Zwentendorf is a place that fascinates.

      The 1976 energy plan provided for the construction of a total of THREE nuclear power plants in Austria on the Danube. One should be in St. Pantaleon-Erla / St. Valentin will be erected on the border between Lower Austria and Upper Austria, for which the areas had already been purchased and another in the Eferdingen basin, where no specific location had yet been determined. A reactor should also be built in St. Andrä in Kärnten. Already in the 1960s, an area next to the Drava was designated for a nuclear power plant.

      As a result, the non-commissioning in December 1978 led to the Nuclear Non-Proliferation Act, according to which no nuclear power plants may be built in the future without a referendum. This law was tightened in 1999 by the Federal Constitutional Law for a Nuclear-Free Austria, which has constitutional status - since the Chernobyl disaster in 1986, anti-nuclear policy has been unanimous in society and in party politics.

      Translated by Google •

        August 22, 2021

        Impressive when you think of the history of this building.

        Translated by Google •

          Sign up for a free komoot account to get 2 more insider tips and takes.

          Sign up for free

          Details

          Informations

          Elevation 180 m

          Weather

          Powered by AerisWeather

          Tuesday 7 October

          16°C

          9°C

          0 %

          If you start your activity now...

          Max wind speed: 11.0 km/h

          Most visited during

          January

          February

          March

          April

          May

          June

          July

          August

          September

          October

          November

          December

          Loading

          Location: Zwentendorf an der Donau, Bezirk Tulln, Mostviertel, Lower Austria, Austria

          Other Popular Places to Check Out

          Explore
          RoutesRoute plannerFeaturesHikesMTB TrailsRoad cycling routesBikepacking
          Download the app
          Follow Us on Socials

          © komoot GmbH

          Privacy Policy