Routes

Planner

Features

Updates

App

Login or Signup

Get the App

Login or Signup

Jenny planned this outdoor adventure with komoot!

Discover your own fun with the #1 outdoor app.

Sign up or log in

Jenny
Saved routes

Durch die Schlucht – Binner Schlucht Runde von Steyerberg

Jenny
Saved routes

Durch die Schlucht – Binner Schlucht Runde von Steyerberg

planned a mountain bike ride

July 26, 2021

Durch die Schlucht – Binner Schlucht Runde von Steyerberg

Moderate

03:08

50.3km

16.0km/h

170m

170m

Like

Share

Embed

Comments

Navigate

Send to Phone

Save

Overview

Moderate mountain bike ride. Good fitness required. Advanced riding skills necessary. The starting point of the route is accessible with public transport.

Includes a segment in which cycling is not permitted

After 15.5 km for 401 m

Waypoints

A

Start point

Bus stop

Get Directions

1

13.1 km

View of the Aue River near the railway bridge

Highlight • Viewpoint

Well worth it, even for a break. Nearby is the railway bridge of the line that connects the former powder factory with Liebenau. The bridge is also passable by bicycle.

Translated by Google •

Tip by

2

15.5 km

a detour to the stone is worthwhile

MGV = male choral society

Translated by Google •

Tip by

3

16.2 km

Bench With a View

Highlight • Viewpoint

There is forest music under the trees with a beautiful view and for the ears

Translated by Google •

Tip by

4

18.1 km

Forest Gorge Trail

Highlight • Trail

5

18.3 km

Binner Gorge

Highlight • Gorge

The foundations for the formation of the Binner Gorge were laid by nature as early as the Ice Age. The gorge is a dry valley between the Nienburg-Meppener Geest and …

Translated by Google •

Tip by

6

18.5 km

Railway Bridge in Binner Gorge

Highlight • Bridge

In the ice age before approx. Huge glaciers shifted south of the Scandinavian mountains for 600,000 years. The local landscape was covered by a 300-400 meter thick layer of ice. …

Translated by Google •

Tip by

7

26.6 km

Wesertor Bridge

Highlight • Bridge

Info from the internet:

Historic bridge location.

At a historic location, the pedestrian bridge, which went into operation in 2000, connects the city center with the district on the west …

Translated by Google •

Tip by

B

50.3 km

End point

Bus stop

Way Types & Surfaces

Way Types

16.4 km

12.7 km

10.4 km

6.23 km

4.13 km

267 m

Surfaces

18.2 km

14.1 km

10.2 km

5.55 km

1.45 km

771 m

Sign up to see more specific route details

Sign up for free

Route Details

Elevation

Elevation

Nothing selected – click and drag below to see the stats for a specific part of the route.

Sign up to see more specific route details

Sign up for free

Weather

Powered by Foreca

Loading

Comments

guide_signup

Want to know more?

Sign up for a free komoot account to join the conversation.

Sign up for free

Loading
Explore
RoutesRoute plannerFeaturesHikesMTB TrailsRoad cycling routesBikepackingSitemap
Download the app
Follow Us on Socials

© komoot GmbH

Privacy Policy