Routes

Planner

Features

Updates

App

Login or Signup

Get the App

Login or Signup

Routes

Tower Bridge – Tower Bridge loop from Central Pacific Freight Depot

Routes

Tower Bridge – Tower Bridge loop from Central Pacific Freight Depot

Easy

4.0

(3)

20

riders

Tower Bridge – Tower Bridge loop from Central Pacific Freight Depot

01:51

30.9km

50m

Gravel riding

Easy gravel ride. Great for any fitness level. Mostly paved surfaces. Suitable for all skill levels. The starting point of the route is accessible with public transport.

Last updated: June 29, 2026

Tips

Includes a segment in which cycling is not permitted

After 30.6 km for 295 m

Waypoints

A

Start point

Train Station

Get Directions

1

663 m

Promenade Overlook

Highlight • Viewpoint

South end of the wide promenade stretching on the east bank of the Sacramento River on both sides of the Capitol Mall Tower bridge. To the south this is the start of the Sacramento River Parkway bike trail.

Tip by

2

1.20 km

River Walk Trail

Highlight • Trail

Excellent paved bike and pedestrian trail, car-free, along the west bank of the Sacramento River

Tip by

3

5.74 km

Barge Canal Trail

Highlight (Segment) • Trail

This peaceful gravel trail runs alongside the Barge Canal, offering pleasant views of the canal, and you might even catch sight of some barges, as the trail's name suggests. There …

Tip by

4

30.1 km

Tower Bridge

Highlight (Segment) • Bridge

The Tower Bridge is a vertical lift bridge that crosses the Sacramento River, connecting Sacramento with West Sacramento. This 160-foot iconic landmark has been in service since 1935.

Tip by

5

30.3 km

Tower Bridge

Highlight • Bridge

The stunning bridge represents a rare use of the Streamline Moderne architectural style in a lift bridge. The Tower Bridge connects West Sacramento in Yolo County to the west with …

Tip by

6

30.5 km

Delta King Hotel

Highlight • Monument

Historic steam boat at the Old Sacramento pier

Tip by

7

30.7 km

The 19th century steam river boat, today a hotel with restaurant, is moored along the historic old Sacramento river front

Tip by

B

30.9 km

End point

Train Station

Loading

Way Types & Surfaces

Way Types

7.76 km

7.57 km

5.61 km

5.26 km

4.70 km

Surfaces

11.9 km

10.7 km

7.76 km

431 m

< 100 m

Sign up to see more specific route details

Sign up for free

Elevation

Elevation

Nothing selected – click and drag below to see the stats for a specific part of the route.

Sign up to see more specific route details

Sign up for free

Weather

Powered by Foreca

Today

Friday 17 July

32°C

14°C

0 %

Additional weather tips

Max wind speed: 17.0 km/h

to get more detailed weather forecasts along your route

Comments

guide_signup

Want to know more?

Sign up for a free komoot account to join the conversation.

Sign up for free

Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.

Save

Edit route

Download GPX

Move start point

Print

Share

Embed on a website

Report an Issue

Report restricted access

Nearby routes

Easy

4.5

29

Lake Natoma – Folsom Historic Truss Bridge loop from Iron Point

01:10h

19.2km

120m

Explore
RoutesRoute plannerFeaturesHikesMTB TrailsRoad cycling routesBikepackingSitemap
Download the app
Follow Us on Socials

© komoot GmbH

Privacy Policy