Routes

Planner

Features

Updates

App

Login or Signup

Get the App

Login or Signup

Routes
United States
New Hampshire
Merrimack County

Gerrish Depot – Winnepesaukee River loop from Penacook

Routes
United States
New Hampshire
Merrimack County

Gerrish Depot – Winnepesaukee River loop from Penacook

Moderate

4.8

(4377)

13,256

riders

Gerrish Depot – Winnepesaukee River loop from Penacook

03:22

65.5km

300m

Gravel riding

Moderate gravel ride. Good fitness required. Mostly paved surfaces. Suitable for all skill levels. The starting point of the route is right next to a parking lot.

Last updated: August 17, 2026

Waypoints

A

Start point

Parking

Get Directions

1

10.3 km

Gerrish Depot

Highlight • Parking

The Gerrish Depot is a nice parking spot near the New Hampshire State Nursery

Tip by

2

19.6 km

Winnepesaukee River

Highlight • River

This river stretches for 10.5 miles and connects to Lake Winnipesaukee. The bridge at this point provides an elevated panoramic view of the waters, creating a perfect spot to take a break and enjoy the scenery.

Tip by

3

20.8 km

Northern Rail Trail (near Webster Lake)

Highlight (Segment) • Trail

Once the railbed of the Boston and Maine Railroad's Northern Line, the Northern Rail Trail is now a lovely, unpaved multi-use trail. This section of the trail winds up alongside …

Tip by

4

22.8 km

There's a public beach here on the south side of Webster Lake, one of the biggest — and prettiest — landmarks along the Northern Rail Trail. The Northern Rail Trail …

Tip by

5

30.6 km

Highland Lake

Highlight • Lake

This is one of the prettiest — and biggest — landmarks along the Northern Rail Trail, which runs along the railbed of the old Boston and Maine Railroad's Northern Line. …

Tip by

33.3 km

Roby Preserve

Nature Reserve

7

36.3 km

Highland Lake

Highlight • Lake

This is one of the prettiest — and biggest — landmarks along the Northern Rail Trail, which runs along the railbed of the old Boston and Maine Railroad's Northern Line. …

Tip by

8

46.3 km

Northern Rail Trail (near Franklin)

Highlight (Segment) • Trail

Once the railbed of the Boston and Maine Railroad's Northern Line, the Northern Rail Trail is now a lovely, unpaved multi-use trail. This section of the trail is mostly compacted …

Tip by

9

65.5 km

Hannah Duston Memorial

Highlight • Monument

From here, to find the Hannah Duston Memorial, head south across the Merrimack River via a paved bridge, parallel to the railroad. Head south for about 400 feet to the …

Tip by

B

65.5 km

End point

Parking

Loading

Way Types & Surfaces

Way Types

60.5 km

4.23 km

449 m

188 m

< 100 m

< 100 m

Surfaces

60.1 km

4.36 km

1.06 km

Sign up to see more specific route details

Sign up for free

Elevation

Elevation

Nothing selected – click and drag below to see the stats for a specific part of the route.

Highest point (200 m)

Lowest point (80 m)

Sign up to see more specific route details

Sign up for free

Weather

Powered by Foreca

Today

Saturday 5 September

24°C

14°C

75 %

Additional weather tips

Max wind speed: 13.0 km/h

to get more detailed weather forecasts along your route

Comments

guide_signup

Want to know more?

Sign up for a free komoot account to join the conversation.

Sign up for free

Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.

Save

Edit route

Download GPX

Move start point

Print

Share

Embed on a website

Report an Issue

Report restricted access

Nearby routes

Hard

5.0

14

Covered Bridge – Elkins Beach loop from Warner

05:18h

74.3km

890m

Explore
RoutesRoute plannerFeaturesRedeem a voucherHikesMTB TrailsRoad cycling routesBikepackingSitemap
Download the app
Follow Us on Socials

© komoot GmbH

Privacy Policy