Jinbu (Odaesan) Station – Yeoryang Bus Terminal loop from 진부
Jinbu (Odaesan) Station – Yeoryang Bus Terminal loop from 진부
2
riders
05:53
82.0km
1,390m
Cycling
Hard bike ride. Very good fitness required. Mostly paved surfaces. Suitable for all skill levels. The starting point of the route is accessible with public transport.
Last updated: May 28, 2026
Tips
Temporary access restrictions
Includes segments with temporary access restrictions.
After 76.0 km for 127 m
Permit required
Waypoints
Start point
Train Station
Get Directions
0 m
Highlight • Rest Area
35.5 km
JoYang River
Lake
37.4 km
Highlight • Rest Area
82.0 km
End point
Train Station
Way Types & Surfaces
Way Types
42.5 km
19.7 km
19.0 km
640 m
144 m
Surfaces
64.5 km
10.2 km
4.11 km
3.22 km
Sign up to see more specific route details
Sign up for free
Elevation
Highest point (910 m)
Lowest point (340 m)
Sign up to see more specific route details
Sign up for free
Weather
Powered by Foreca
Wednesday 3 June
22°C
14°C
-- %
Additional weather tips
Max wind speed: -- km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Want to know more?
Sign up for a free komoot account to join the conversation.
Sign up for free