Troy Train Depot – Cheshire Rail Trail loop from Eagle Reserve Conservation Area
Troy Train Depot – Cheshire Rail Trail loop from Eagle Reserve Conservation Area
2.6
(21)
95
riders
06:26
90.4km
930m
Gravel riding
Hard gravel ride. Very good fitness required. Mostly paved surfaces. The starting point of the route is right next to a parking lot.
Last updated: November 12, 2026
Waypoints
Start point
Parking
19.9 km
Highlight • Historical Site
Tip by
22.8 km
Highlight (Segment) • Trail
Tip by
34.3 km
Carter Forest
Nature Reserve
36.0 km
Ryan Wildlife Management Area
Nature Reserve
41.2 km
Highlight • Lake
Tip by
59.4 km
Highlight • Beach
Tip by
90.4 km
End point
Parking
Way Types & Surfaces
Way Types
44.1 km
22.7 km
18.5 km
2.84 km
2.37 km
Surfaces
43.8 km
25.6 km
20.5 km
634 m
Sign up to see more specific route details
Sign up for freeElevation
Highest point (470 m)
Lowest point (240 m)
Sign up to see more specific route details
Sign up for freeWeather
Powered by Foreca
Today
Sunday 22 November
14°C
0°C
14 %
Additional weather tips
Max wind speed: 6.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Want to know more?
Sign up for a free komoot account to join the conversation.