Routes

Planner

Features

Updates

App

Login or Signup

Get the App

Login or Signup

Routes
Mountain biking trails
Indonesia

Pinus Warnang-Warban Climb – Gowes Porridge loop from Cikudapateuh

Routes
Mountain biking trails
Indonesia

Pinus Warnang-Warban Climb – Gowes Porridge loop from Cikudapateuh

Moderate

5.0

(1)

6

riders

Pinus Warnang-Warban Climb – Gowes Porridge loop from Cikudapateuh

02:07

27.8km

640m

Mountain biking

Moderate mountain bike ride. Good fitness required. Suitable for all skill levels. The starting point of the route is accessible with public transport.

Last updated: June 25, 2026

Tips

Your route passes through a protected area

Please check local regulations for:

Taman Hutan Raya Ir. H. Juanda

Waypoints

A

Start point

Train Station

Get Directions

1

11.2 km

Warung Tomat Junction

Highlight • Trail

Go north if you want to go to Bukit Bintang or JSPD, go west if you want to go to Dago/Tebingkeraton via Warban. South down to Bojongkoneng via Ramp Mahdi or Cimenyan.

Translated by Google •

Tip by

2

11.2 km

Pesanggrahan Bandung Utara Hill Traverse

Highlight (Segment) • Cycleway

The main route is from Warban to Bojongkoneng/Cimenyan and vice versa. This route has extraordinary views. Previously, this route was a place to play on MTB, XC and gravel bikes. …

Translated by Google •

Tip by

3

13.8 km

Do you think that after warban there won't be any more crazy climbs? Wow, that's wrong. This is just the opening menu. From here there is still another uphill climb …

Translated by Google •

Tip by

4

15.0 km

Bumi Herbal Dago

Highlight • Cafe

One of the nice hangout places in North Bandung. Usually there are lots of cyclists and trail runners who hang out here, whether they have finished from here straight home, …

Translated by Google •

Tip by

5

15.1 km

7

16.2 km

Pinus Warnang-Warban Climb

Highlight • Climb

600 meter. Max gradient 19%

Tip by

8

18.2 km

Gowes Porridge

Highlight • Cafe

Before going to warban/warna, stop by for breakfast. Don't climb on an empty stomach, you'll find out later

Translated by Google •

Tip by

B

27.8 km

End point

Train Station

Loading

Way Types & Surfaces

Way Types

17.3 km

5.38 km

3.05 km

2.08 km

Surfaces

15.9 km

8.90 km

2.82 km

129 m

Sign up to see more specific route details

Sign up for free

Elevation

Elevation

Nothing selected – click and drag below to see the stats for a specific part of the route.

Highest point (1,240 m)

Lowest point (690 m)

Sign up to see more specific route details

Sign up for free

Weather

Powered by Foreca

Friday 26 June

31°C

18°C

42 %

Additional weather tips

Max wind speed: 2.0 km/h

to get more detailed weather forecasts along your route

Comments

guide_signup

Want to know more?

Sign up for a free komoot account to join the conversation.

Sign up for free

Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.

Save

Edit route

Download GPX

Move start point

Print

Share

Embed on a website

Report an Issue

Report restricted access

Nearby routes

Hard

4.6

17

Gambung Tea Plantation – Cisangkuy Floodway loop from Ciroyom

06:17h

96.8km

1,380m

Explore
RoutesRoute plannerFeaturesHikesMTB TrailsRoad cycling routesBikepackingSitemap
Download the app
Follow Us on Socials

© komoot GmbH

Privacy Policy