Viaduct over the A6 motorway – Green Bridge over the Płonia loop from Szczecin Zdroje
Viaduct over the A6 motorway – Green Bridge over the Płonia loop from Szczecin Zdroje
5.0
(3)
23
riders
03:03
46.5km
210m
Mountain biking
Moderate mountain bike ride. Good fitness required. Advanced riding skills necessary. The starting point of the route is accessible with public transport.
Last updated: August 21, 2026
Tips
Cycling is not permitted along parts of this route
After 0 m for 277 m
After 46.3 km for 277 m
Waypoints
Start point
Train Station
Get Directions
1.72 km
Park Leśny Klęskowo
Forest
2.07 km
Highlight • Rest Area
Translated by Google •
Tip by
2.49 km
Highlight • Religious Site
Showing Translation
Tip by
4.50 km
Jeleni Staw
Lake
5.48 km
Highlight • Bridge
Translated by Google •
Tip by
8.54 km
Highlight • Rest Area
Showing Translation
Tip by
29.3 km
Highlight (Segment) • Cycleway
Showing Translation
Tip by
36.6 km
Highlight • Bridge
Translated by Google •
Tip by
46.5 km
End point
Train Station
Way Types & Surfaces
Way Types
14.7 km
13.4 km
7.88 km
5.70 km
4.63 km
199 m
Surfaces
23.6 km
12.7 km
4.70 km
3.40 km
1.86 km
136 m
Sign up to see more specific route details
Sign up for free
Elevation
Sign up to see more specific route details
Sign up for free
Weather
Powered by Foreca
Thursday 3 September
22°C
16°C
94 %
Additional weather tips
Max wind speed: 36.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Want to know more?
Sign up for a free komoot account to join the conversation.
Sign up for free