Mimico Creek Pedestrian Bridge – Humber Bay Waterfront Trail loop from Wynford
Mimico Creek Pedestrian Bridge – Humber Bay Waterfront Trail loop from Wynford
389
riders
02:21
56.3km
240m
Road cycling
Moderate road ride. Good fitness required. Some segments of this route may be unpaved and difficult to ride. The starting point of the route is accessible with public transport.
Last updated: February 23, 2026
Tips
Cycling is not permitted along parts of this route
After 15.6 km for 161 m
After 53.8 km for 60 m
Waypoints
Start point
Train Station
Get Directions
5.79 km
Beachwood Wetland
Lake
10.8 km
Highlight • Other
15.7 km
Peter Slip
Lake
18.1 km
Highlight • Viewpoint
25.4 km
Highlight • Bridge
26.9 km
Highlight • Viewpoint
30.7 km
Highlight (Segment) • Trail
36.8 km
Highlight • Trail
56.3 km
End point
Train Station
Way Types & Surfaces
Way Types
48.3 km
6.43 km
662 m
597 m
183 m
< 100 m
< 100 m
Surfaces
51.9 km
3.90 km
265 m
223 m
< 100 m
Sign up to see more specific route details
Sign up for free
Elevation
Highest point (130 m)
Lowest point (70 m)
Sign up to see more specific route details
Sign up for free
Weather
Powered by Foreca
Today
Sunday 19 April
7°C
-2°C
30 %
Additional weather tips
Max wind speed: 10.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.