7
riders
03:30
60.0km
1,340m
Hard road ride. Very good fitness required. Mostly well-paved surfaces and easy to ride. The starting point of the route is accessible with public transport.
Last updated: November 13, 2025
Waypoints
Start point
Bus stop
Get Directions
28.0 km
Kuntung Temboan
Peak
39.0 km
Sineleyan Lake
Lake
45.1 km
Tomohon View Point
Viewpoint
47.4 km
Tinoor
Viewpoint
60.0 km
End point
Bus stop
Way Types & Surfaces
Way Types
30.7 km
16.5 km
7.00 km
3.05 km
2.77 km
Surfaces
53.2 km
6.66 km
183 m
Sign up to see more specific route details
Sign up for free
Elevation
Sign up to see more specific route details
Sign up for free
Weather
Powered by AerisWeather
Tuesday 2 December
32°C
28°C
40 %
If you start your activity now...
Max wind speed: 13.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.