New Asphalt Towards Purfing – Baldham-Ingelsberg Street loop from Zorneding
New Asphalt Towards Purfing – Baldham-Ingelsberg Street loop from Zorneding
5.0
(1)
30
riders
00:50
19.5km
80m
Road cycling
Easy road ride. Mostly well-paved surfaces and easy to ride. The starting point of the route is accessible with public transport.
Last updated: November 2, 2026
Tips
Includes a segment in which cycling is not permitted
After 15.3 km for 188 m
Waypoints
Start point
Train Station
1.77 km
Highlight • Settlement
Translated by Google •
Tip by
3.43 km
Highlight • Cycleway
Translated by Google •
Tip by
5.28 km
Highlight • Religious Site
Translated by Google •
Tip by
10.3 km
Highlight (Segment) • Cycleway
Translated by Google •
Tip by
13.3 km
Highlight • Religious Site
Translated by Google •
Tip by
17.1 km
Highlight • Cycleway
Translated by Google •
Tip by
19.5 km
End point
Train Station
Way Types & Surfaces
Way Types
11.3 km
4.70 km
2.67 km
428 m
348 m
< 100 m
Surfaces
18.8 km
361 m
232 m
< 100 m
Sign up to see more specific route details
Sign up for freeElevation
Sign up to see more specific route details
Sign up for freeWeather
Powered by Foreca
Tuesday 3 November
6°C
2°C
0 %
Additional weather tips
Expect light wind and shifting conditions.
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Showing Translation
Want to know more?
Sign up for a free komoot account to join the conversation.