Eonni Cafe – View of palm oil plantations loop from KG05 Kwasa Sentral
Eonni Cafe – View of palm oil plantations loop from KG05 Kwasa Sentral
70
riders
05:16
88.2km
490m
Cycling
Hard bike ride. Very good fitness required. Mostly paved surfaces. Suitable for all skill levels. The starting point of the route is accessible with public transport.
Last updated: February 4, 2026
Tips
Your route passes through a protected area
Please check local regulations for:
Hutan Simpanan Kekal Rantau Panjang
Waypoints
Start point
Train Station
Get Directions
9.28 km
Highlight • Cafe
Tip by
35.0 km
Highlight • Cycleway
80.7 km
Highlight • Viewpoint
88.2 km
End point
Train Station
Way Types & Surfaces
Way Types
48.5 km
25.3 km
13.8 km
402 m
233 m
< 100 m
Surfaces
66.6 km
18.8 km
2.34 km
492 m
Sign up to see more specific route details
Sign up for free
Elevation
Sign up to see more specific route details
Sign up for free
Weather
Powered by Foreca
Today
Tuesday 24 February
33°C
26°C
49 %
Additional weather tips
Max wind speed: 10.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Add komoot as a preferred source in your Google results
Add now