Routes

Planner

Features

Updates

App

Login or Signup

Get the App

Login or Signup

Discover
Places to see
Belgium
Flanders
South Limburg

Stokrooie Bridge

Highlight • Bridge

Stokrooie Bridge

Recommended by 19 hikers

Save

Share

  • More

  • Save

    Share

  • More

  • Take Me There

    Routes here

    Best Hikes to Stokrooie Bridge

    4.1

    (29)

    253

    hikers

    1. Herkenrode Abbey Site – Herkenrode Abbey Mill loop from Stokrooie

    9.52km

    02:24

    20m

    20m

    Intermediate hike. Good fitness required. Easily-accessible paths. Suitable for all skill levels.

    Navigate

    Send to Phone

    Intermediate

    Expert hike. Very good fitness required. Easily-accessible paths. Suitable for all skill levels.

    Expert

    Expert hike. Very good fitness required. Easily-accessible paths. Suitable for all skill levels.

    Expert

    Tips

    October 8, 2024

    Until September 2019, the bridge at Stokrooie was a concrete girder bridge over the Albert Canal. The bridge is part of the N729 regional road. Previously, the canal could be crossed via an arch bridge that was built in 1937, but it was destroyed during the Second World War. After this, a temporary bridge was built, which was later replaced by a concrete girder bridge. In October 2017, work started on a new steel arch bridge over the Albert Canal. This had been parallel to the concrete girder bridge since March 2019. In September 2019, the old girder bridge was demolished and the new bridge was put into use. After this, the canal underpass was widened from 50 metres to 86 metres.

    Translated by Google •

      June 1, 2024

      De Vlaamse Waterweg nv is raising the Stokrooie bridge. Raising the bridge and locally widening the Albert Canal is part of the upgrading of the Albert Canal. This larger project involves eliminating capacity-limiting bottlenecks on the Albert Canal.

      The steel structure for the new bridge was prepared in a workshop and then assembled at an assembly site along the Albert Canal. This assembled bridge will be sailed in and completed next weekend. On Saturday evening and night, the bridge will be moved from the assembly site onto a pontoon. The pontoon will then sail towards the new location at around 7.30 am on Sunday morning. Once there, the pontoon is turned and the bridge is lifted over the temporary abutments.

      The new bridge will be built upstream parallel to the existing bridge. This means that the interruption of the N729 can be limited to 4 weeks during the connection to the new bridge.

      If everything goes according to plan, the new bridge will be opened to traffic in July 2019. The old bridge will be demolished in August.

      vlaamsewaterweg.be/nieuws/brug-stokrooie-vaart-naar- definive-plaats

      Translated by Google •

        In the know? Log-in to add a tip for other adventurers!

        Sign up for free

        Details

        Informations

        Elevation 10 m

        Weather

        Powered by AerisWeather

        Today

        Wednesday 5 November

        17°C

        10°C

        0 %

        If you start your activity now...

        Max wind speed: 14.0 km/h

        Most visited during

        January

        February

        March

        April

        May

        June

        July

        August

        September

        October

        November

        December

        Loading

        Location: South Limburg, Flanders, Belgium

        Other Popular Places to Check Out

        Herkenrode Abbey and Nature Reserve

        Explore
        RoutesRoute plannerFeaturesHikesMTB TrailsRoad cycling routesBikepacking
        Download the app
        Follow Us on Socials

        © komoot GmbH

        Privacy Policy