Highlight • Bridge
Cycling
4.4
(49)
Road cycling
4.7
(29)
Gravel riding
5.0
(3)
Most Cłowy, also known historically as Reglitzbrücke or Zollbrücke, is a pivotal bridge spanning the Regalica River in Szczecin, Poland. Situated in the Zachodniopomorskie Voivodeship, this significant structure connects the city's left and right banks, serving as a crucial transportation artery and a gateway to areas like Dąbie. Its strategic Most Cłowy bridge location and purpose have been central to Szczecin's development for centuries, making it a notable landmark in the urban landscape.
Visitors frequently appreciate the historical depth of…
Tips
January 27, 2023
Road cycling
September 10, 2023
Cycling

Sign up for a free komoot account to get 3 more insider tips and takes.
Sign up for free
Nearby routes
Best routes near Cłowy Bridge

4.0
(2)
87
riders
79.6km
03:19
300m
300m
Moderate road ride. Good fitness required. Some segments of this route may be unpaved and difficult to ride.

4.5
(4)
91
riders
18.8km
00:53
50m
50m
Easy road ride. Great for any fitness level. Mostly well-paved surfaces and easy to ride.

5.0
(4)
73
riders
Easy road ride. Great for any fitness level. Mostly well-paved surfaces and easy to ride.
Details
Weather
Powered by Foreca
Thursday 14 May
15°C
3°C
35 %
Additional weather tips
Max wind speed: 8.0 km/h
Most visited during
January
February
March
April
May
June
July
August
September
October
November
December
Walking across Most Cłowy is generally considered easy. The bridge itself is 204.85 meters long, so a full crossing takes only a few minutes at a leisurely pace. It features pedestrian sidewalks on both sides, making it accessible for most visitors.
While the bridge itself is a short crossing, it serves as a gateway to various urban and riverside paths. You can extend your walk or cycle along the Regalica River banks or explore the nearby areas of Szczecin. For detailed routes, consider checking komoot for community-generated suggestions that incorporate the bridge into longer tours.
Yes, Most Cłowy is considered family-friendly. Its wide pedestrian sidewalks make it suitable for families with young children and those pushing strollers. The flat, even surface ensures an easy and safe crossing.
The bridge itself is suitable for walking dogs on a leash. For more extensive dog-friendly areas, you can explore the green spaces along the Regalica River or nearby urban parks in Szczecin. Always ensure your dog is under control and follow local regulations.
Most Cłowy is a crucial transportation link and a main exit route from Szczecin, meaning it has good public transport access. Numerous bus and tram lines serve the area, connecting it to various parts of the city. Check local public transport schedules for the most convenient routes to stops near the bridge.
As Most Cłowy is situated within Szczecin's urban landscape, you'll find various cafes, pubs, and restaurants within a reasonable distance, particularly towards the city center. For accommodation, there are hotels and guesthouses available throughout Szczecin, with options ranging from budget-friendly to more upscale, depending on your preference.
Most Cłowy can be visited year-round. In winter, the bridge remains accessible, but be prepared for colder temperatures and potentially icy conditions on the sidewalks. Dressing in warm layers, including a hat, gloves, and waterproof footwear, is advisable. The views can be particularly atmospheric with snow or frost.
While the bridge itself offers pleasant views of the Regalica River and the harbor, exploring the riverbanks slightly upstream or downstream can provide different perspectives. Consider walking along the waterfront paths to capture the bridge's full span and its integration into the Szczecin skyline, especially during sunrise or sunset for dramatic lighting.
The name 'Most Cłowy' translates to 'Customs Bridge' in English. This name derives from its original function in the Middle Ages as a customs point. At this location, tolls were collected from passing ships and carts, and duties were levied on goods, highlighting its historical importance as a trade and communication route.
The current Most Cłowy is a steel bridge. It was completely rebuilt after a major structural failure in 2016, with the new steel supporting structure being assembled in 2017. The bridge was reopened to traffic in August 2017, utilizing the renovated original pillars and abutments.