Routes

Route planner

Features

Product updates

Get the App

Login or Signup

Get the App

Login or Signup

Discover
Places to see

Poland

Masovian Voivodeship

Sochaczew

Młodzieszyn

Bridge over the Bzura River in Kamion

Discover
Places to see

Poland

Masovian Voivodeship

Sochaczew

Młodzieszyn

Bridge over the Bzura River in Kamion

Bridge over the Bzura River in Kamion

Recommended by 16 road cyclists

Save

Share

  • More

  • Save

    Share

  • More

  • Take Me There

    Hikes here

    Best Road Cycling Rides to Bridge over the Bzura River in Kamion

    5.0

    (5)

    34

    riders

    1. Wooden Church in Kaliszki loop from Nowy Dwór Mazowiecki

    88.0km

    03:23

    150m

    Intermediate road ride. Good fitness required. Mostly well-paved surfaces and easy to ride.

    Navigate

    Send to Phone

    Intermediate

    Intermediate road ride. Good fitness required. Some segments of this route may be unpaved and difficult to ride.

    Intermediate

    Intermediate road ride. Good fitness required. Mostly well-paved surfaces and easy to ride.

    Intermediate

    Tips

    April 7, 2025

    The first bridge over the Bzura in Kamion was built in 1915. It was a wooden structure of a temporary nature. After 9 years, the bridge was destroyed during the flood in 1924. It was rebuilt in the same year, but the ice embankments (elements protecting the bridge from flowing ice floes) were not made until the following year. The war that began in 1939 caused the destruction of five spans, which were later repaired by the Germans. Military operations in 1945 and the flowing ice floes in 1947 destroyed the bridge again, but in 1947 it was rebuilt by the State Road Bridge Reconstruction Directorate over the Vistula and Bzura near Wyszogród. In this form (during the last reconstruction it received steel girders) the bridge survived until 2010, when the flowing ice floes damaged it so much that vehicle traffic had to be significantly limited (to 3.5 tons and max. 2 m wide.

    The reconstruction, or rather construction from scratch, was carried out in the "Design and Build" system. It turned out to be necessary to rebuild the drainage, technical infrastructure devices and build traffic safety devices. The structure has four spans, is 160.5 m long and 9 m wide and has a load capacity that allows for the movement of vehicles weighing up to 80 tons.

    The contractor completed the work on October 30, 2012, while the ceremonial handover of the new bridge to the residents of Kamion and the Sochaczew district took place on January 2, 2013. The total cost of the works in Kamion amounted to PLN 14.7 million. The subsidy in the amount of PLN 6.8 million came from government funds for the removal of the effects of flooding, which was allocated by the Mazovian Voivode Jacek Kozłowski. The remaining funds in the amount of PLN 7.9 million were provided by the local government of the Mazovian Voivodeship.

    Translated by Google •

      In the know? Log-in to add a tip for other adventurers!

      Sign up for free

      Details

      Informations

      Elevation 110 m

      Weather

      Powered by AerisWeather

      Today

      Monday 15 September

      20°C

      15°C

      0 %

      If you start your activity now...

      Max wind speed: 9.0 km/h

      Most visited during

      January

      February

      March

      April

      May

      June

      July

      August

      September

      October

      November

      December

      Loading

      Location: Młodzieszyn, Sochaczew, Masovian Voivodeship, Poland

      Other Popular Places to Check Out

      Explore
      RoutesRoute plannerFeaturesHikesMTB TrailsRoad cycling routesBikepacking
      Download the app
      Follow Us on Socials

      © komoot GmbH

      Privacy Policy