Cycling Highlight
Recommended by 14 out of 15 cyclists
The 470,000 line passes over the Blavet and up the hill through a tunnel and a beautiful bridge, wide enough to be taken on foot without risk.This line is currently only used for freight (cereals) but was used for travelers until 1960 (occasionally between 1951 and 1960).
August 7, 2022
A railway bridge over the Blavet that leads directly into a tunnel. There is only freight traffic here. At around 35km, this was half the distance from Pontivy to Lorient for us.
August 26, 2024
In the know? Log-in to add a tip for other adventurers!