komoot
  • Discover
  • Route planner
  • Features
Discover

Tauber Brücke

Tauber Brücke

Bike Touring Highlight (Segment)

Created by komoot users
Recommended by 524 out of 573 cyclists

Cycling may not be permitted along parts of this segment

You may need to dismount and push your bike.

loading

Tips

  • Derda Von Dort

    Main-Tauber Bridge,
      On the bridge towards Main drove a second parking space under the elevated road with a view of the river.
      The bike path is good.

    translated byView Original
    • May 5, 2018

  • Michael

    A beautiful bridge over the Tauber in Wertheim.

    translated byView Original
    • July 10, 2019

  • Martina

    The bridge was opened to traffic on March 30, 2017, after a year of construction

    translated byView Original
    • April 12, 2020

  • Alpvelo

    Beautiful bridge over the lovely Tauber.

    translated byView Original
    • July 18, 2018

  • Michael Hck

    Bridge over the Tauber. Has a bit of Amsterdam

    translated byView Original
    • March 28, 2021

  • INGEADFC

    Camping Azur at Wertheim is expensive, but highly recommended: right on the Main, quiet, decent Sanitäranlagen.Wer has no tent, can also stay in the barrel.

    translated byView Original
    • July 12, 2018

  • Mario

    From here it is not far to the confluence of robbers and Main.

    translated byView Original
    • April 2, 2019

  • ThK

    Beautiful wine popping event in July of Ballweg and Maack

    translated byView Original
    • April 3, 2019

  • Oliver Rei

    If you come by here, you should also look at the level on the side. There are marks of past floods and you get an impression of how high the water has been. When I was young, I saw it myself, how the Tauber stood on the lower edge of the bridge and partially flooded it...

    translated byView Original
    • April 26, 2022

  • Spiro

    From the bridge there is a beautiful view of the castle and the Tauber.

    translated byView Original
    • September 9, 2020

  • Didada

    Dimensions: 12.7 meters wide, 36 meters wingspan
    built in the years 1873/74
    1976 transferred from the state to the ownership of the city of Wertheim
    The Tauber Bridge is the bottleneck for the old town bypass and the Taubertalstraße in the direction of Tauberbischofsheim. Around 8,500 vehicles pass it every day (count from 2007).
    In the event of a flood, it serves as a central access point to the old town.
    The new building is designed for a load of 60 tons.
    Total costs: estimated 3.9 million euros
    Funding: expected to be around 2.25 million euros

    translated byView Original
    • June 27, 2022

In the know? Log-in to add a tip for other adventurers!

Top Touring Cycling Routes to Tauber Brücke

loading

Our Tour recommendations are based on thousands of activities completed by other people on komoot.

Learn More
  • Easy
    00:41
    6.10 mi
    9.0 mph
    175 ft
    175 ft
  • Intermediate
    00:31
    3.98 mi
    7.8 mph
    50 ft
    50 ft
  • Difficult
    04:37
    40.4 mi
    8.8 mph
    2,725 ft
    2,700 ft
  • Difficult
    04:31
    44.6 mi
    9.9 mph
    2,100 ft
    2,100 ft
  • Difficult
    03:29
    33.1 mi
    9.5 mph
    1,975 ft
    1,975 ft
  • Difficult
    03:25
    31.9 mi
    9.3 mph
    2,425 ft
    2,425 ft
  • Plan Your Own Tour
loading
Location: Wertheim, Liebliches Taubertal, Stuttgart District, Baden-Württemberg, Germany

Information

  • Distance69 yd
  • Uphill0 ft
  • Downhill0 ft

Most Visited During

  • Jan
  • Feb
  • Mar
  • Apr
  • May
  • Jun
  • Jul
  • Aug
  • Sep
  • Oct
  • Nov
  • Dec

Weather Forecast - Wertheim

loading