Routes

Planner

Features

Updates

App

Login or Signup

Get the App

Login or Signup

Discover
Places to see
Netherlands
South Holland
Zoetermeer

Water Tower De Tien Gemeenten

Highlight • Monument

Water Tower De Tien Gemeenten

Recommended by 91 cyclists out of 99

Save

Share

  • More

  • Save

    Share

  • More

  • Take Me There

    Routes here

    Top cycling routes to Water Tower De Tien Gemeenten

    5.0

    (1)

    28

    riders

    1. Juliana Lock – Mill the Vier Winden loop from Meerzicht

    63.9km

    03:40

    100m

    100m

    Moderate bike ride. Good fitness required. Mostly paved surfaces. Suitable for all skill levels.

    Navigate

    Send to Phone

    Moderate

    Easy bike ride. Great for any fitness level. Mostly paved surfaces. Suitable for all skill levels.

    Easy

    Easy bike ride. Great for any fitness level. Mostly paved surfaces. Suitable for all skill levels.

    Easy

    Tips

    June 23, 2024

    The water tower has been for sale for years in vain. History and Zoetermeer have a difficult relationship with each other.

    Translated by Google •

      March 3, 2022

      Water tower De Tien Gemeenten was built in 1927 to a design by architect A.H. Wegerif in collaboration with Delft professor C. Visser and architect A.H. Goldberg.

      The assignment was given by the Drinking Water Supply Foundation De Tien Gemeenten. In 1921, at the initiative of Zoetermeer and Zegwaart, Ten Municipalities had developed plans for a water pipeline from the Wassenaar dunes. In order to get pressure on the pipeline, a container with water at a great height was needed and that became the water tower. The arms of the ten municipalities adorn the entrance. The tower was decommissioned in the early 1990s.

      The municipal monument is approximately 45 meters high and rests on 324 piles with an average length of 14 meters. The water reservoir is located at the point where the octagonal shape of the tower changes into a sixteen-sided shape. The reservoir is made of reinforced concrete and has a capacity of 500,000 litres.

      A destination for the building is still being discussed. Ranging from offices to a B&B.

      Translated by Google •

        October 12, 2025

        The water tower is currently being converted into a bed and breakfast with a breakfast room. Meeting rooms are also being added. The In de buurt website shows impressions of the final result: indebuurt.nl/zoetermeer/nieuws/zo-komt-de-watertoren-er-straks-als-bed-and-breakfast-uit-te-zien~196303

        Translated by Google •

          In the know? Log-in to add a tip for other adventurers!

          Sign up for free

          Details

          Informations

          Elevation 0 m

          Weather

          Powered by Foreca

          Thursday 25 December

          2°C

          -5°C

          -- %

          Additional weather tips

          Max wind speed: -- km/h

          Most visited during

          January

          February

          March

          April

          May

          June

          July

          August

          September

          October

          November

          December

          Loading

          Location: Zoetermeer, South Holland, Netherlands

          Other Popular Places to Check Out

          Along the Canal in Leiden

          Explore
          RoutesRoute plannerFeaturesHikesMTB TrailsRoad cycling routesBikepacking
          Download the app
          Follow Us on Socials

          © komoot GmbH

          Privacy Policy