The run-of-river power plant was built as a result of the barrage expansion of the Main from Schweinfurt to Bamberg. This section was opened to traffic in 1962 as a large shipping route (federal waterway). The power plant went into operation a year later and has two Kaplan turbines with a total output of 3.8 MW.
November 29, 2021
The barrage was put into operation in 1962 and the run-of-river power plant in 1963 as part of the expansion of the Main barrage. The turbines together have an output of 3.8 MW.
March 21, 2023
In the know? Log-in to add a tip for other adventurers!
Location: Lower Franconia, Bavaria, Germany
4.7
(16)
65
01:24
5.35km
40m
4.8
(13)
52
02:47
10.5km
100m
5.0
(2)
7
05:07
20.0km
70m