Routes

Planner

Features

Updates

App

Login or Signup

Get the App

Login or Signup

Discover
Places to see
Serbia
Vojvodina

Žeželj Bridge

Highlight • Bridge

Žeželj Bridge

Recommended by 9 road cyclists

Save

Share

  • More

  • Save

    Share

  • More

  • Take Me There

    Routes here

    Best Road Cycling Rides to Žeželj Bridge

    4.0

    (6)

    156

    riders

    1. Varadin Bridge – Žeželj Bridge loop from Петроварадин

    76.4km

    03:12

    130m

    130m

    Intermediate road ride. Good fitness required. Some segments of this route may be unpaved and difficult to ride.

    Navigate

    Send to Phone

    Intermediate

    Intermediate road ride. Good fitness required. Mostly well-paved surfaces and easy to ride.

    Intermediate

    Intermediate road ride. Good fitness required. Mostly well-paved surfaces and easy to ride.

    Intermediate

    Tips

    August 3, 2021

    The original Zhezel Bridge (377 meters long) was over an arch bridge built between 1957 and 1961. It was designed by the eminent Yugoslav civil engineer Branko Zhezel and was constructed by Mostogradnja. It connected the urban area of ​​Novi Sad and Petrovaradin. During its existence, it served as part of an international railway line and as a transit route through Novi Sad.

    Original bridge damaged in 1999 (before complete destruction a few days later)
    During the NATO bombing of Yugoslavia, the bridge was bombed 12 times. On 23 April 1999, it was finally destroyed, disrupting rail transport between Belgrade and Subotica, ie [3]. During the NATO bombing, all three major bridges over the Danube in Novi Sad (Zhezel Bridge, Varadin Bridge and the Freedom Bridge) were completely destroyed.


    In 2000, a temporary Road-Railway Bridge was built near Zhezhel Bridge to serve as a replacement for Zhezhel Bridge until a new one was built. Over the years, the construction of the new Zhezel Bridge has been postponed several times.

    Construction work on the new bridge on the same site officially began in April 2012. The main designer of the new bridge was Alexander Bojovic, and the contractor was an international consortium, JV Azvi - Taddei - Horta Coslada. The new bridge is visually similar to the destroyed bridge, except that the arches are made of steel and not prestressed concrete. The bridge consists of two arches, the larger being 219 meters (719 feet) long and 42 meters (138 feet) high, and the smaller 177 meters (581 feet) long and 34 meters (112 feet) high. 7]

    In October 2017, the arches of Zhezel Bridge were connected after five years of construction and eighteen years after the demolition of the previous bridge. As of October 2017, the construction works amounted to EUR 51.71 million. The bridge was completed in April 2018 and regular rail transport was established. The transit of the vehicle was established on September 1, 2018. Encyclopedia site: bg.wikiqube.net

      In the know? Log-in to add a tip for other adventurers!

      Sign up for free

      Details

      Informations

      Elevation 130 m

      Weather

      Powered by AerisWeather

      Today

      Friday 24 October

      16°C

      5°C

      0 %

      If you start your activity now...

      Max wind speed: 25.0 km/h

      Most visited during

      January

      February

      March

      April

      May

      June

      July

      August

      September

      October

      November

      December

      Loading

      Location: Vojvodina, Serbia

      Other Popular Places to Check Out

      Beli Majdan Cave

      Explore
      RoutesRoute plannerFeaturesHikesMTB TrailsRoad cycling routesBikepacking
      Download the app
      Follow Us on Socials

      © komoot GmbH

      Privacy Policy