Built in concrete from June 1905 to December 1908 by the engineer Albert Claveille, it is 105 meters long and houses a hydroelectric plant2. Its commissioning in 1909 made it possible at the time to supply electricity not only to Bergerac and Périgueux, but also to Bordeaux and Angoulême.