Hiking Highlight
Recommended by 146 out of 149 hikers
Location: Ribeira Grande (Matriz)
4.7
(45)
299
01:49
6.18km
190m
4.5
(392)
1,588
02:24
8.20km
230m
3.3
(4)
28
05:44
20.2km
450m
The Fajã Redonda Water Plant has been active since 1927, having been modernized in 2005. Today it has more modern channels, sand traps and ducts, contributing to the production of electrical energy. The place of great natural beauty is accessible by following the PRC 29 SMI trail;
December 8, 2023
The reservoir is the reservoir for the hydroelectric power plant a bit further down. Part of the circular route PRC 29 SMI
October 11, 2017
The short detour to the small lake is worth it, go to the end, then you can see the small waterfall best...
February 14, 2024
In the know? Log-in to add a tip for other adventurers!
Location: Ribeira Grande (Matriz)
4.7
(45)
299
01:49
6.18km
190m
4.5
(392)
1,588
02:24
8.20km
230m
3.3
(4)
28
05:44
20.2km
450m