Hiking Highlight
Recommended by 178 out of 181 hikers
Location: Água De Alto
4.7
(51)
224
01:22
4.56km
150m
4.8
(574)
2,606
05:00
15.6km
680m
4.3
(3)
13
08:06
25.7km
1,000m
But the path is accessible again, where PRIVADO stood in the spring, the door is now open again.
August 12, 2022
First hydroelectric power station on the way. A sign with the story is set up. Operated from 1904-1974
October 4, 2017
In operation until 1974, now nature is taking everything back
September 30, 2020
Sign up for a free komoot account to get 4 more insider tips and takes.
Location: Água De Alto
4.7
(51)
224
01:22
4.56km
150m
4.8
(574)
2,606
05:00
15.6km
680m
4.3
(3)
13
08:06
25.7km
1,000m