Kenilworth Greenway Diversion (HS2 Construction)
Kenilworth Greenway Diversion (HS2 Construction)
Tips
September 15, 2020
Cycling

In the know? Log-in to add a tip for other adventurers!
Nearby routes
Best routes near Kenilworth Greenway Diversion (HS2 Construction)

4.0
(19)
24
riders
Easy bike ride. Great for any fitness level. Mostly paved surfaces. Suitable for all skill levels.

16
riders
Easy bike ride. Great for any fitness level. Mostly paved surfaces. Suitable for all skill levels.

5.0
(1)
9
riders
24.2km
01:30
180m
180m
Moderate bike ride. Good fitness required. Mostly paved surfaces. Suitable for all skill levels.
Details
Informations
Elevation 120 m
Weather
Powered by Foreca
Tuesday 6 October
14°C
8°C
94 %
Additional weather tips
Max wind speed: 24.0 km/h
Most visited during
January
February
March
April
May
June
July
August
September
October
November
December