Cycling Highlight
Recommended by 1359 out of 1401 cyclists
As early as 1978 it was decided to convert the section between Ochtrup and Wettringen into a cycle path. In the 1990s, the measure was completed along the entire route, albeit mostly with a water-bound surface. The section from Rheine to Wettringen has been completely asphalted since 2017. The crossing-free stretch from the former train station in Neuenkirchen to Offlumer See is equipped with lights.
January 21, 2023
Via this railway line you can get quickly from Rheine to Wettringen without car traffic
December 19, 2020
Sign up for a free komoot account to get 18 more insider tips and takes.