Hiking Highlight
Recommended by 252 out of 262 hikers
This Highlight is in a protected area
Please check local regulations for: Área Protegida para a Gestão de Habitats ou Espécies da Serra de Água de Pau
Location: Água De Alto
4.8
(5)
35
02:00
6.96km
170m
4.7
(146)
968
03:46
12.4km
420m
4.3
(3)
13
08:06
25.7km
1,000m
Here rainwater is collected for water supply and for the hydroelectric power plant Fábrica Nova from 1927. The water channel (Levada) as a power station feed line starts here
October 14, 2017
Sign up for a free komoot account to get 5 more insider tips and takes.
Location: Água De Alto
4.8
(5)
35
02:00
6.96km
170m
4.7
(146)
968
03:46
12.4km
420m
4.3
(3)
13
08:06
25.7km
1,000m