Routes

Planner

Features

Updates

App

Login or Signup

Get the App

Login or Signup

Anna DeSmet planned this outdoor adventure with komoot!

Discover your own fun with the #1 outdoor app.

Sign up or log in

Anna DeSmet
Saved routes

Hubbrücke Columbia River Loop from Southeast Park Avenue

Anna DeSmet
Saved routes

Hubbrücke Columbia River Loop from Southeast Park Avenue

planned a bike ride

April 4, 2022

Hubbrücke Columbia River Loop from Southeast Park Avenue

Moderate

01:58

32.9km

16.7km/h

160m

160m

Like

Share

Embed

Comments

Navigate

Send to Phone

Save

Overview

Moderate bike ride. Good fitness required. Mostly paved surfaces. Suitable for all skill levels. The starting point of the route is accessible with public transport.

Includes movable bridges

Check opening times.

After 14.4 km for 82 m

After 15.1 km for 82 m

After 19.7 km for 67 m

Waypoints

A

Start point

Train Station

Get Directions

1

14.9 km

Broadway Bridge

Highlight • Bridge

The Broadway Bridge was built in 1913. It was originally black, but was repainted red in 1963.

Tip by

B

32.9 km

End point

Train Station

Way Types & Surfaces

Way Types

30.8 km

1.70 km

216 m

180 m

< 100 m

< 100 m

Surfaces

15.6 km

13.3 km

3.47 km

415 m

< 100 m

Sign up to see more specific route details

Sign up for free

Route Details

Elevation

Elevation

Nothing selected – click and drag below to see the stats for a specific part of the route.

Sign up to see more specific route details

Sign up for free

Weather

Powered by Foreca

Loading

Comments

guide_signup

Want to know more?

Sign up for a free komoot account to join the conversation.

Sign up for free

Loading
Explore
RoutesRoute plannerFeaturesHikesMTB TrailsRoad cycling routesBikepackingSitemap
Download the app
Follow Us on Socials

© komoot GmbH

Privacy Policy