RoutesPlannerFeaturesUpdates
App
Login or Signup
Get the App
Login or Signup
Pinguin89 planned this outdoor adventure with komoot!

Discover your own fun with the #1 outdoor app.

Sign up or log in
Pinguin89
Saved routes

Theißtal über Hohe Kanzel 16km 430hm

Pinguin89
Saved routes

Theißtal über Hohe Kanzel 16km 430hm

planned a hike

November 1, 2026

Theißtal über Hohe Kanzel 16km 430hm

Moderate

03:39

15.6km

4.3km/h

430m

430m

Taunus Mo😎🚶‍♀️🚵‍♂️ liked this tour.

1ShareEmbedComments
NavigateSend to PhoneSave

Overview

Moderate hike. Good fitness required. Easily walkable paths.

Waypoints

A

Niedernhausen Station

Highlight • Rest Area

The Niedernhausen railway station in the Taunus region is the most important station on the Main-Lahn Railway between Frankfurt-Höchst and Eschhofen stations near Limburg an der Lahn. It is the terminus of the Ländchesbahn, which runs from Wiesbaden Central Station, the capital of the German state of Hesse, to Niedernhausen, and also the terminus of the S2 line of the Rhine-Main S-Bahn (suburban railway).

Niedernhausen station was built in 1877 by the Hessian Ludwig Railway as part of the construction of the Main-Lahn Railway from Frankfurt am Main to Limburg an der Lahn. The final section of the line, between Frankfurt-Höchst and Idstein, was opened on October 15, 1877, completing the connection between the Rhine-Main region and the Limburg Basin. With the opening of the Ländchesbahn railway line from Niedernhausen to Wiesbaden in 1879, Niedernhausen (at kilometer 31.80) became the most important railway station between Höchst and Eschhofen near Limburg, where the Main-Lahn Railway joins the Lahn Valley Railway. As a railway junction, Niedernhausen station was equipped with a locomotive shed with a turntable (now converted into six lofts), a railway water tower, a coal bunker, and sidings for steam locomotives. The locomotive shed and water tower are now listed as historical monuments.[1] The first station building was constructed in 1880 and replaced by a more impressive new building on January 1, 1906. The station contributed significantly to the growth of the previously small town and its neighboring communities. Niedernhausen, which had been designated a health resort at the turn of the century, could now conveniently transport its spa guests by train. In 1913, with the construction of the second track, the level crossing to the neighboring town of Königshofen was replaced by a modern railway bridge.

During World War II, the station was the target of several air raids. The most devastating of these, on February 22, 1945, destroyed the station building, large sections of the track, approximately 30 parked locomotives, and dozens of railcars. Reconstruction began after the war. A new station building with a signal box was constructed. The number of railway employees rose to 100. The shift of freight transport to trucks later led to the closure of the station's freight handling facilities. With the end of the steam locomotive era in October 1973, the no-longer-needed facilities were dismantled. On August 25, 1975, the Rhine-Main S-Bahn (suburban railway) began operation; Niedernhausen became the terminus of line S2. From 1978, it ran through the new Frankfurt S-Bahn tunnel to Hauptwache station. In 1983, the Frankfurt S-Bahn tunnel was extended to Konstablerwache station, and in 1990 to Südbahnhof (South Station). In 1993, the S2 line ran to Mühlberg station, before the tunnel in Offenbach was opened and, in 2003, the Rodgau S-Bahn line was extended to Dietzenbach. The complete electrification of the line to Limburg was finished in 1988. Between 2004 and 2014, the Ländchesbahn was operated by vectus Verkehrsgesellschaft, which was then replaced by Hessische Landesbahn (HLB). The central bus station (ZOB) for the municipality is located in front of the station building.

Translated by Google •

Tip by

1

1.77 km

View of Theißtal Bridge

Highlight • Viewpoint

View over fields to the Theistalbrücke

Translated by Google •

Tip by

2

3.47 km

3

4.77 km

Hohe Kanzel

Highlight • Summit

Highest point in the area.
There is no visibility because the trees are now too big. Nevertheless, a nice cozy place.

Translated by Google •

Tip by

4

5.16 km

Shoe Tree in the Taunus

Highlight • Structure

Funny story.
Who comes up with something like that? and shoes hang high up in the treetops.

Translated by Google •

Tip by

5

6.94 km

View of Feldberg

Highlight • Viewpoint

When the weather is nice you can see the Feldberg and the Taunus ridge

Translated by Google •

Tip by

6

8.82 km

Forest Rest Area in the Taunus

Highlight • Rest Area

Great rest area

Translated by Google •

Tip by

7

13.2 km

Theißtal Lake

Highlight • Lake

Arrive not far from Niedernhausen and let your mind wander.

Translated by Google •

Tip by

B

15.6 km

Niedernhausen Station

Highlight • Rest Area

The Niedernhausen railway station in the Taunus region is the most important station on the Main-Lahn Railway between Frankfurt-Höchst and Eschhofen stations near Limburg an der Lahn. It is the terminus of the Ländchesbahn, which runs from Wiesbaden Central Station, the capital of the German state of Hesse, to Niedernhausen, and also the terminus of the S2 line of the Rhine-Main S-Bahn (suburban railway).

Niedernhausen station was built in 1877 by the Hessian Ludwig Railway as part of the construction of the Main-Lahn Railway from Frankfurt am Main to Limburg an der Lahn. The final section of the line, between Frankfurt-Höchst and Idstein, was opened on October 15, 1877, completing the connection between the Rhine-Main region and the Limburg Basin. With the opening of the Ländchesbahn railway line from Niedernhausen to Wiesbaden in 1879, Niedernhausen (at kilometer 31.80) became the most important railway station between Höchst and Eschhofen near Limburg, where the Main-Lahn Railway joins the Lahn Valley Railway. As a railway junction, Niedernhausen station was equipped with a locomotive shed with a turntable (now converted into six lofts), a railway water tower, a coal bunker, and sidings for steam locomotives. The locomotive shed and water tower are now listed as historical monuments.[1] The first station building was constructed in 1880 and replaced by a more impressive new building on January 1, 1906. The station contributed significantly to the growth of the previously small town and its neighboring communities. Niedernhausen, which had been designated a health resort at the turn of the century, could now conveniently transport its spa guests by train. In 1913, with the construction of the second track, the level crossing to the neighboring town of Königshofen was replaced by a modern railway bridge.

During World War II, the station was the target of several air raids. The most devastating of these, on February 22, 1945, destroyed the station building, large sections of the track, approximately 30 parked locomotives, and dozens of railcars. Reconstruction began after the war. A new station building with a signal box was constructed. The number of railway employees rose to 100. The shift of freight transport to trucks later led to the closure of the station's freight handling facilities. With the end of the steam locomotive era in October 1973, the no-longer-needed facilities were dismantled. On August 25, 1975, the Rhine-Main S-Bahn (suburban railway) began operation; Niedernhausen became the terminus of line S2. From 1978, it ran through the new Frankfurt S-Bahn tunnel to Hauptwache station. In 1983, the Frankfurt S-Bahn tunnel was extended to Konstablerwache station, and in 1990 to Südbahnhof (South Station). In 1993, the S2 line ran to Mühlberg station, before the tunnel in Offenbach was opened and, in 2003, the Rodgau S-Bahn line was extended to Dietzenbach. The complete electrification of the line to Limburg was finished in 1988. Between 2004 and 2014, the Ländchesbahn was operated by vectus Verkehrsgesellschaft, which was then replaced by Hessische Landesbahn (HLB). The central bus station (ZOB) for the municipality is located in front of the station building.

Translated by Google •

Tip by

Way Types & Surfaces

Way Types

10.5 km

3.53 km

1.39 km

128 m

Surfaces

4.48 km

4.37 km

3.42 km

2.33 km

865 m

117 m

Sign up to see more specific route details

Sign up for free

Route Details

Elevation

Elevation
Nothing selected – click and drag below to see the stats for a specific part of the route.

Highest point (580 m)

Lowest point (270 m)

Sign up to see more specific route details

Sign up for free

Weather

Powered by Foreca

Loading

Comments

guide_signup

Want to know more?

Sign up for a free komoot account to join the conversation.

Sign up for free
Loading
Explore
RoutesRoute plannerFeaturesRedeem a voucherHikesMTB TrailsRoad cycling routesBikepackingSitemap
Download the app
Follow Us on Socials

© komoot GmbH

Privacy Policy