Footbridge over the Żerański Canal – Fort Beniaminów loop from Kobyłka
Footbridge over the Żerański Canal – Fort Beniaminów loop from Kobyłka
5.0
(2)
57
riders
01:59
48.1km
90m
Road cycling
Easy road ride. Mostly well-paved surfaces and easy to ride. The starting point of the route is accessible with public transport.
Last updated: August 18, 2026
Waypoints
Start point
Train Station
16.9 km
Highlight • Structure
21.0 km
Highlight • Bridge
Translated by Google •
Tip by
22.2 km
Highlight • Bridge
Translated by Google •
Tip by
24.6 km
Highlight • Forest
Translated by Google •
Tip by
27.9 km
Highlight • Historical Site
Translated by Google •
Tip by
48.1 km
End point
Train Station
Way Types & Surfaces
Way Types
32.5 km
10.8 km
4.56 km
204 m
174 m
Surfaces
42.5 km
4.41 km
1.02 km
223 m
Sign up to see more specific route details
Sign up for freeElevation
Sign up to see more specific route details
Sign up for freeWeather
Powered by Foreca
Friday 30 October
11°C
5°C
63 %
Additional weather tips
There’s a fairly high chance of rain. Consider packing a waterproof jacket.
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Want to know more?
Sign up for a free komoot account to join the conversation.