View from the bridge – Greenway bridge loop from Chabenet
View from the bridge – Greenway bridge loop from Chabenet
3
riders
02:03
34.3km
240m
Cycling
Moderate bike ride. Good fitness required. Mostly paved surfaces. The starting point of the route is accessible with public transport.
Last updated: August 26, 2026
Tips
Includes segments that go up or down a series of steps
You may need to carry your bike.
After 26.3 km for 33 m
After 26.6 km for 33 m
Waypoints
Start point
Train Station
2.84 km
La Creuse
Lake
25.4 km
Highlight • Viewpoint
Translated by Google •
Tip by
25.4 km
Highlight • Other
Translated by Google •
Tip by
25.4 km
Highlight • Other
Translated by Google •
Tip by
26.5 km
Highlight • Bridge
Translated by Google •
Tip by
26.5 km
Highlight • Other
Translated by Google •
Tip by
27.1 km
Highlight • Monument
34.3 km
End point
Train Station
Way Types & Surfaces
Way Types
27.7 km
3.98 km
2.34 km
200 m
< 100 m
Surfaces
32.3 km
1.74 km
187 m
< 100 m
Sign up to see more specific route details
Sign up for freeElevation
Highest point (190 m)
Lowest point (90 m)
Sign up to see more specific route details
Sign up for freeWeather
Powered by Foreca
Wednesday 4 November
15°C
3°C
-- %
Additional weather tips
Max wind speed: -- km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Want to know more?
Sign up for a free komoot account to join the conversation.