Pinetown Amish Covered Bridge – Mill on the creek loop from Mount Airy
Pinetown Amish Covered Bridge – Mill on the creek loop from Mount Airy
4.6
(1524)
13,687
riders
03:14
71.5km
530m
Road cycling
Moderate road ride. Good fitness required. Mostly well-paved surfaces and easy to ride. The starting point of the route is right next to a parking lot.
Last updated: April 23, 2026
Waypoints
Start point
Parking
Get Directions
27.8 km
Highlight • Bridge
Tip by
42.7 km
Highlight • Cycleway
Tip by
43.2 km
Highlight • Bridge
Tip by
44.7 km
Highlight • Monument
Tip by
71.5 km
End point
Parking
Way Types & Surfaces
Way Types
52.1 km
19.4 km
122 m
Surfaces
51.5 km
20.1 km
< 100 m
Sign up to see more specific route details
Sign up for free
Elevation
Sign up to see more specific route details
Sign up for free
Weather
Powered by Foreca
Today
Sunday 31 May
23°C
8°C
0 %
Additional weather tips
Max wind speed: 18.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.