Page Avenue Bridge – Frontier Park loop from Harvester
Page Avenue Bridge – Frontier Park loop from Harvester
4.6
(9072)
16,131
riders
01:59
31.8km
140m
Cycling
Easy bike ride. Mostly paved surfaces. The starting point of the route is right next to a parking lot.
Last updated: October 27, 2026
Tips
Temporary access restrictions
Includes segments with temporary access restrictions.
After 31.0 km for 112 m
Customers only
Waypoints
Start point
Parking
8.33 km
Highlight • Bridge
10.00 km
Highlight (Segment) • Trail
Tip by
14.9 km
Highlight • Rest Area
Tip by
15.3 km
Highlight • Historical Site
Tip by
18.2 km
Highlight (Segment) • Trail
Tip by
26.1 km
Highlight • Rest Area
31.8 km
End point
Parking
Way Types & Surfaces
Way Types
20.6 km
6.68 km
3.86 km
625 m
102 m
Surfaces
20.6 km
7.49 km
3.21 km
564 m
Sign up to see more specific route details
Sign up for freeElevation
Highest point (190 m)
Lowest point (130 m)
Sign up to see more specific route details
Sign up for freeWeather
Powered by Foreca
Today
Thursday 12 November
10°C
2°C
0 %
Additional weather tips
Expect light wind and shifting conditions.
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Want to know more?
Sign up for a free komoot account to join the conversation.