Footbridge over the Notec Canal – Singletrack Forest Path loop from Bydgoszcz Błonie
Footbridge over the Notec Canal – Singletrack Forest Path loop from Bydgoszcz Błonie
4.9
(14)
69
riders
02:04
32.6km
80m
Cycling
Moderate bike ride. Good fitness required. Mostly paved surfaces. The starting point of the route is accessible with public transport.
Last updated: August 23, 2026
Tips
Cycling is not permitted along parts of this route
After 0 m for 260 m
After 32.4 km for 260 m
Waypoints
Start point
Train Station
1.02 km
Highlight • Trail
14.0 km
Highlight (Segment) • Bridge
14.5 km
Highlight • Bridge
Translated by Google •
Tip by
14.9 km
Highlight • Bridge
Translated by Google •
Tip by
17.9 km
Highlight (Segment) • Cycleway
Translated by Google •
Tip by
30.7 km
Highlight • Trail
32.6 km
End point
Train Station
Way Types & Surfaces
Way Types
13.6 km
11.9 km
3.78 km
1.84 km
1.15 km
372 m
Surfaces
22.4 km
3.83 km
3.37 km
2.89 km
< 100 m
Sign up to see more specific route details
Sign up for freeElevation
Sign up to see more specific route details
Sign up for freeWeather
Powered by Foreca
Wednesday 4 November
7°C
-2°C
-- %
Additional weather tips
Max wind speed: -- km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Want to know more?
Sign up for a free komoot account to join the conversation.