Martin Olav Sabo Bridge – Martin Olav Sabo Bridge loop from Saint Louis Park
Martin Olav Sabo Bridge – Martin Olav Sabo Bridge loop from Saint Louis Park
2.7
(6)
78
riders
00:46
19.7km
50m
Road cycling
Easy road ride. Mostly well-paved surfaces and easy to ride. The starting point of the route is accessible with public transport.
Last updated: November 9, 2026
Tips
Temporary access restrictions
Includes segments with temporary access restrictions.
After 5.34 km for 1.89 km
Closed: • October 27, 2026-October 30, 2026 (otherwise open)
After 12.7 km for 1.73 km
Closed: • October 27, 2026-October 30, 2026 (otherwise open)
After 14.4 km for 73 m
Dismount required: • October 27, 2026-October 30, 2026 (otherwise open)
After 14.5 km for 81 m
Closed: • October 27, 2026-October 30, 2026 (otherwise open)
Waypoints
Start point
Bus stop
3.31 km
Highlight (Segment) • Cycleway
Tip by
9.14 km
Highlight (Segment) • Bridge
Tip by
10.7 km
Highlight • Bridge
Tip by
15.8 km
Highlight (Segment) • Cycleway
Tip by
19.7 km
End point
Bus stop
Way Types & Surfaces
Way Types
19.0 km
609 m
108 m
< 100 m
Surfaces
19.1 km
682 m
< 100 m
Sign up to see more specific route details
Sign up for freeElevation
Sign up to see more specific route details
Sign up for freeWeather
Powered by Foreca
Today
Tuesday 10 November
14°C
2°C
0 %
Additional weather tips
Max wind speed: 9.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Want to know more?
Sign up for a free komoot account to join the conversation.